450 N Street Indoor Air Testing & Report Log

Office of Public Affairs
1-916-327-8988
Floor Project/Event Work By Status of Project Status of Report Title of Report
(click to see report)
Penthouse Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2014 - Random Sampling
Penthouse Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2014 - Random Sampling
Penthouse Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted May 2014 – Random Sampling
Penthouse Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted April 2014 – Random Sampling
Penthouse Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2014 – Random Sampling
Penthouse Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – Random Sampling
Penthouse Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 2013 – Random Sampling
Penthouse Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2013 – Random Sampling
Penthouse Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted August 2013 – Random Sampling
Penthouse Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted May 2013 – Random Sampling
Penthouse Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted April 2013 Random Sampling
Penthouse Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2013 Random Sampling
Penthouse Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2013 Random Sampling
Penthouse Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2012 Random Sampling
Penthouse Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2012 Random Sampling
Penthouse Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 5, 2012 - Limited Fungal Growth Exposure Assessment Surveys September 2012 Random Sampling
Penthouse Water Line Repair Project LCD Completed Received/Posted February 29, 2012 - Daily Logs/Lab Reports Domestic Waterline Repair Project
Penthouse Asbestos and Lead Based Paint Survey LaCroix Davis Completed Received/Posted February 29, 2012 - Asbestos and Lead Based Paint Survey
Penthouse Limited Drinking Water Quality Assessment HTI Completed Received/Posted January 6, 2012 - Limited Drinking Water Quality Assessment
Penthouse Mold Remediation Closure Report LaCroix Davis Completed Received/Posted September 29, 2011 - Mold Remediation – Penthouse Floor December 23, 2009 – May 11, 2010, April 25, 2011 – June 26, 2011, July 25, 2011 – August 22, 2011 Closure Report
24 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2014 - Random Sampling
24 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2014 - Random Sampling
24 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted May 2014 – Random Sampling
24 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted April 2014 – Random Sampling
24 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2014 – QPCR Air Sampling
24 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2014 – Random Sampling
24 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2014 – Random Sampling
24 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2014 – Random Sampling
24 Quarterly Air Monitoring Report Andersen Environmental Completed Received/Posted Fourth Quarter of 2013
24 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – Random Sampling
24 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – QPCR Air Sampling
24 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – Random Sampling
24 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 2013 – Random Sampling
24 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2013 – Random Sampling
24 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2013 – QPCR Air Sampling
24 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted August 2013 – Random Sampling
24 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2013 – Random Sampling
24 Quarterly Air Monitoring Report Andersen Environmental Completed Received/Posted Second Quarter of 2013
24 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2013 – Random Sampling
24 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted May 2013 – Random Sampling
24 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted April 2013 Random Sampling
24 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2013 Random Sampling
24 Pipe Investigation Work Conducted 4/26/13 & 4/27/13 GHD Completed Received/Posted Industrial Hygiene Report for Pipe Investigation Work Conducted 4/26/13 & 4/27/13
24 Statistical Analysis of Monthly Air Monitoring Data for Year 2012 LCD Completed Received/Posted Statistical Analysis of Monthly Air Monitoring Data for Year 2012
24 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2013 Random Sampling
24 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2013 Random Sampling
24 Mold Remediation LCD Completed Received/Posted January 15, 2013 Revised Closure Report Addenda
24 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2012 – QPCR Air Sampling
24 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2012 Random Sampling
24 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2012 Random Sampling
24 Monthly Air Monitoring Report LCD Completed Received/Posted Monthly Air Monitoring Report November 2012
24 Mold Remediation LCD Completed Received/Posted October 31 2012 – Closure Report Addendum
24 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 2012 – QPCR Air Sampling
24 Monthly air monitoring report LCD Completed Received/Posted October16, 2012 – Monthly Air Monitoring Report September 2012
24 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2012 Random Sampling
24 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 5, 2012 - Limited Fungal Growth Exposure Assessment Surveys September 2012 Random Sampling
24 VCT Removal Report LCD Completed Received/Posted August 30, 2012 Vinyl Composite Tile Removal Report
24 Monthly Air Monitoring Report LCD Completed Received/Posted August 15, 2012 – Monthly Air Monitoring Report July 2012
24 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2012 Random Sampling
24 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2012 – QPCR Air Sampling
24 Monthly Air Monitoring Report LCD Completed Received/Posted June 15, 2012 - Monthly Air Monitoring Report, May 2012
24 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted May 10, 2012 - April 2012 QPCR Air Sampling
24 Monthly air monitoring report LaCroix Davis Completed Received/Posted April 12, 2012 - Monthly Monitoring Report for March 2012
24 Water Line Repair Project LCD Completed Received/Posted February 29, 2012 - Daily Logs/Lab Reports Domestic Waterline Repair Project
24 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2012 - QPCR Air Sampling
24 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2011 - December 2011 QPCR Air Sampling
24 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2011 - QPCR Air Sampling
24 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 18, 2012 - Limited Fungal Growth Exposure Assessment Surveys - Random Air Sampling
24 Fungal Growth Inspection and Exposure Assessment Survey HTI Completed Received/Posted September 30, 2011 - Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation
24 24TH Floor Pre-Occupancy Assessment HTI Completed Received/Posted September 1, 2009 - Limited Indoor Air Quality Survey - 24TH Floor Pre-Occupancy Assessment
24 Cal/OHSA Notice of No Violation 5/23/08 Cal/OHSA Completed Received/Posted May 23, 2008 - Cal/OHSA Notice
24 Ceiling Tile Assessment HTI Completed Received/Posted February 19, 2008 - HTI Report
24 Fungi Evaluation Sterling Completed Received/Posted October 29, 2007 - Sterling Report
24 Air sampling DGS Completed Received/Posted October 5, 2007 - MicroTest Report
24 Air sampling DGS Completed Received/Posted October 4, 2007 - MicroTest Report (3)
24 Air and Tape sampling DGS Completed Received/Posted October 4, 2007 - MicroTest Report (2)
24 Air sampling DGS Completed Received/Posted October 4, 2007 - MicroTest Report
24 Air sampling DGS Completed Received/Posted October 3, 2007 - MicroTest Report
24 Air sampling DGS Completed Received/Posted October 3, 2007 - MicroTest Report(2)
24 Air sampling LaCroix Davis Completed Received/Posted January 18, 2006 - LaCroix Davis Report
24 Air sampling DGS Completed Received/Posted November 4, 2004 - DGS Report
24 Air sampling DGS Completed Received/Posted July 20, 2004 - DGS Report
23 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2014 - Random Sampling
23 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2014 - QPCR Air Sampling
23 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2014 - Random Sampling
23 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted May 2014 – Random Sampling
23 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted April 2014 – Random Sampling
23 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2014 – Random Sampling
23 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2014 – Random Sampling
23 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2014 – Random Sampling
23 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – Random Sampling
23 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – QPCR Air Sampling
23 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2013 – Random Sampling
23 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – Random Sampling
23 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 2013 – Random Sampling
23 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2013 – Random Sampling
23 Quarterly Air Monitoring Report Andersen Environmental Completed Received/Posted Third Quarter of 2013
23 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted August 2013 – Random Sampling
23 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2013 – Random Sampling
23 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2013 – Random Sampling
23 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted May 2013 – Random Sampling
23 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2013 – QPCR Air Sampling
23 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted April 2013 Random Sampling
23 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2013 Random Sampling
23 Statistical Analysis of Monthly Air Monitoring Data for Year 2012 LCD Completed Received/Posted Statistical Analysis of Monthly Air Monitoring Data for Year 2012
23 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2013 Random Sampling
23 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2013 Random Sampling
23 Mold Remediation LCD Completed Received/Posted January 15, 2013 Revised Closure Report Addenda
23 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2012 Random Sampling
23 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2012 Random Sampling
23 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2012 – QPCR Air Sampling
23 Monthly Air Monitoring Report LCD Completed Received/Posted November 19, 2012 – Monthly Air Monitoring Report October 2012
23 Mold Remediation LCD Completed Received/Posted October 31 2012 – Closure Report Addendum
23 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 2012 – QPCR Air Sampling
23 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted October 22, 2012 - Limited Fungal Growth Exposure Assessment Survey September 2012 QPCR Air Sampling
23 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2012 Random Sampling
23 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 5, 2012 - Limited Fungal Growth Exposure Assessment Surveys September 2012 Random Sampling
23 Monthly Air Monitoring Report LCD Completed Received/Posted September 19, 2012 – Monthly Air Monitoring Report August 2012
23 VCT Removal Report LCD Completed Received/Posted August 30, 2012 Vinyl Composite Tile Removal Report
23 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2012 QPCR Air Sampling
23 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2012 Random Sampling
23 Monthly Air Monitoring Report LCD Completed Received/Posted July 18, 2012 - Monthly Air Monitoring Report for June 2012
23 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted June 11, 2012 - May 2012 QPCR Air Sampling
23 Air Monitoring Report LCD Completed Received/Posted May 22, 2012 - Monthly Air Monitoring Report for April 2012
23 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted March, 2012 - QPCR Air Sampling
23 Water Line Repair Project LCD Completed Received/Posted February 29, 2012 - Daily Logs/Lab Reports Domestic Waterline Repair Project
23 Air Monitoring LCD Completed Received/Posted May 22, 2012 – Revised Monthly Air Monitoring Report for February 2012
23 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2012 - QPCR Air Sampling
23 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2011 - QPCR Air Sampling
23 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2011 - QPCR Air Sampling
23 Fungal Growth Inspection and Exposure Assessment Survey HTI Completed Received/Posted September 30, 2011 - Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation
23 Pre-Occupancy Assessment HTI Completed Received/Posted August 28, 2009 - Limited Indoor Air Quality Survey - 23RD Floor Pre-Occupancy Assessment
23 Cal/OHSA Notice of No Violation 5/23/08 Cal/OHSA Completed Received/Posted May 23, 2008 - Cal/OHSA Notice
23 Post Mitigation Assessment BioMax Completed Received/Posted March 31, 2008-BioMax Report
23 Fungi Evaluation Sterling Completed Received/Posted October 29, 2007 - Sterling Report
23 Air sampling DGS Completed Received/Posted October 5, 2007 - MicroTest Report
23 Air sampling DGS Completed Received/Posted October 4, 2007 - MicroTest Report (3)
23 Air sampling DGS Completed Received/Posted October 4, 2007 - MicroTest Report
23 Air sampling DGS Completed Received/Posted October 3, 2007 - MicroTest Report
23 Air sampling DGS Completed Received/Posted October 3, 2007 - MicroTest Report (2)
23 Mold Evaluation Entek Completed Received/Posted June 15, 2007 - Entek Report
22 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2014 - Random Sampling
22 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2014 - Random Sampling
22 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted May 2014 – Random Sampling
22 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted April 2014 – Random Sampling
22 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2014 – QPCR Air Sampling
22 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2014 – Random Sampling
22 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2014 – Random Sampling
22 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2014 – Random Sampling
22 Quarterly Air Monitoring Report Andersen Environmental Completed Received/Posted Fourth Quarter of 2013
22 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – Random Sampling
22 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – QPCR Air Sampling
22 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2013 – Random Sampling
22 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – Random Sampling
22 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 2013 – Random Sampling
22 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2013 – Random Sampling
22 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2013 – QPCR Air Sampling
22 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted August 2013 – Random Sampling
22 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2013 – Random Sampling
22 Quarterly Air Monitoring Report Andersen Environmental Completed Received/Posted Second Quarter of 2013
22 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2013 – Random Sampling
22 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted May 2013 – Random Sampling
22 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted April 2013 Random Sampling
22 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2013 Random Sampling
22 Statistical Analysis of Monthly Air Monitoring Data for Year 2012 LCD Completed Received/Posted Statistical Analysis of Monthly Air Monitoring Data for Year 2012
22 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2013 Random Sampling
22 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2013 Random Sampling
22 Mold Remediation LCD Completed Received/Posted January 15, 2013 Revised Closure Report Addenda
22 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2012 – QPCR Air Sampling
22 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2012 Random Sampling
22 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2012 Random Sampling
22 Monthly Air Monitoring Report LCD Completed Received/Posted Monthly Air Monitoring Report November 2012
22 Mold Remediation LCD Completed Received/Posted October 31 2012 – Closure Report Addendum
22 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 2012 – QPCR Air Sampling
22 Monthly air monitoring report LCD Completed Received/Posted October16, 2012 – Monthly Air Monitoring Report September 2012
22 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2012 Random Sampling
22 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 5, 2012 - Limited Fungal Growth Exposure Assessment Surveys September 2012 Random Sampling
22 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted September 14, 2012 - Limited Fungal Growth Exposure Assessment Survey August 2012 QPCR Air Sampling
22 VCT Removal Report LCD Completed Received/Posted August 30, 2012 Vinyl Composite Tile Removal Report
22 Monthly Air Monitoring Report LCD Completed Received/Posted August 15, 2012 – Monthly Air Monitoring Report July 2012
22 Limited Drinking Water Quality Assessment HTI Completed Received/Posted December 7, 2011 - Limited Drinking Water Quality Assessment
22 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2012 Random Sampling
22 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2012 – QPCR Air Sampling
22 Monthly Air Monitoring Report LCD Completed Received/Posted June 15, 2012 - Monthly Air Monitoring Report, May 2012
22 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted May 10, 2012 - April 2012 QPCR Air Sampling
22 Monthly air monitoring report LaCroix Davis Completed Received/Posted April 12, 2012 - Monthly Monitoring Report for March 2012
22 Water Line Repair Project LCD Completed Received/Posted February 29, 2012 - Daily Logs/Lab Reports Domestic Waterline Repair Project
22 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2012 - QPCR Air Sampling
22 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2011 - QPCR Air Sampling
22 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2011 - QPCR Air Sampling
22 Vinyl Composite Tile Investigation Report LaCroix Davis Completed Received/Posted January 18, 2012 - Vinyl Composite Tile Investigation Report
22 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 18, 2012 - Limited Fungal Growth Exposure Assessment Surveys - Random Air Sampling
22 Air Monitoring for Volatile Organic Compounds (VOC's) Entek Completed Received/Posted November 30, 2011 - Entek Final Report of Air Monitoring for Volatile Organic Compounds (VOC's)
22 Fungal Growth Inspection and Exposure Assessment Survey HTI Completed Received/Posted September 30, 2011 - Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation
22 Posting of Proposition 65 Warnings HTI Completed Received/Posted August 19, 2011 - Posting of Proposition 65 Warnings
22 Pre-Occupancy Assessment HTI Completed Received/Posted June 4, 2009 – Limited Indoor Air Quality Survey, 22nd Floor Pre-Occupancy Assessment
22 Microbial Assessment BioMax Completed Received/Posted June 19th, 2008 - Microbial Assessment of 22nd Floor South Plenum Area
22 Odor Investigation Report LaCroix Davis Completed Received/Posted May 24, 2011 - 22nd Floor Tile and Odor Investigation Report
22 Cal/OHSA Notice of No Violation 5/23/08 Cal/OHSA Completed Received/Posted May 23, 2008 - Cal/OHSA Notice
22 Wall Cavity Testing HTI Completed Received/Posted February 15, 2008 - HTI Report
22 January 4, 2008 Storm Water Intrusion McGinnis Chen Completed Received/Posted January 11, 2008 Report re Storm Water Intrusions
22 Fungi Evaluation Sterling Completed Received/Posted October 29, 2007 - Sterling Report
22 Air sampling DGS Completed Received/ Posted October 5, 2007 - MicroTest Report
22 Air sampling DGS Completed Received/Posted October 4, 2007 - MicroTest Report
22 Air sampling DGS Completed Received/Posted October 3, 2007 - MicroTest Report
22 Air sampling DGS Completed Received/Posted October 3, 2007 - MicroTest Report (2)
22 Mold Evaluation Entek Completed Received/Posted June 15, 2007 - Entek Report
22 Air sampling DGS Completed Received/Posted May 4, 2007 - MicroTest Report
22 Air sampling DGS Completed Received/Posted May 2, 2007 - MicroTest Report
22 Air sampling DGS Completed Received/Posted January 22, 2007 - MicroTest Report
22 Air sampling DGS Completed Received/Posted December 6, 2006 - DGS
22 Air sampling LaCroix Davis Completed Received/Posted January 18, 2006 - LaCroix Davis Report
22 Air sampling DGS Completed Received/Posted December 1, 2005 - DGS Report
22 Air sampling DGS Completed Received/Posted November 4, 2004 - DGS Report
22 Air sampling DGS Completed Received/Posted July 20, 2004 - DGS Report
21 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2014 - Random Sampling
21 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2014 - QPCR Air Sampling
21 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2014 - Random Sampling
21 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted May 2014 – Random Sampling
21 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted April 2014 – Random Sampling
21 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2014 – Random Sampling
21 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2014 – Random Sampling
21 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2014 – Random Sampling
21 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – Random Sampling
21 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – QPCR Air Sampling
21 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2013 – Random Sampling
21 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – Random Sampling
21 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 2013 – Random Sampling
21 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2013 – Random Sampling
21 Quarterly Air Monitoring Report Andersen Environmental Completed Received/Posted Third Quarter of 2013
21 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted August 2013 – Random Sampling
21 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2013 – Random Sampling
21 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2013 – Random Sampling
21 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted May 2013 – Random Sampling
21 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2013 – QPCR Air Sampling
21 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted April 2013 Random Sampling
21 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2013 Random Sampling
21 Statistical Analysis of Monthly Air Monitoring Data for Year 2012 LCD Completed Received/Posted Statistical Analysis of Monthly Air Monitoring Data for Year 2012
21 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2013 Random Sampling
21 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2013 Random Sampling
21 Mold Remediation LCD Completed Received/Posted January 15, 2013 Revised Closure Report Addenda
21 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2012 Random Sampling
21 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2012 Random Sampling
21 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2012 – QPCR Air Sampling
21 Monthly Air Monitoring Report LCD Completed Received/Posted November 19, 2012 – Monthly Air Monitoring Report October 2012
21 Mold Remediation LCD Completed Received/Posted October 31 2012 – Closure Report Addendum
21 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 2012 – QPCR Air Sampling
21 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted October 22, 2012 - Limited Fungal Growth Exposure Assessment Survey September 2012 QPCR Air Sampling
21 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2012 Random Sampling
21 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 5, 2012 - Limited Fungal Growth Exposure Assessment Surveys September 2012 Random Sampling
21 Monthly Air Monitoring Report LCD Completed Received/Posted September 19, 2012 – Monthly Air Monitoring Report August 2012
21 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2012 QPCR Air Sampling
21 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2012 Random Sampling
21 Monthly Air Monitoring Report LCD Completed Received/Posted July 18, 2012 - Monthly Air Monitoring Report for June 2012
21 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted June 11, 2012 - May 2012 QPCR Air Sampling
21 HVAC System Investigation LaCroix Davis Completed Received/Posted June 5, 2012 - Heating, Ventilation and Air Conditioning (HVAC) System Investigation
21 Air Monitoring Report LCD Completed Received/Posted May 22, 2012 - Monthly Air Monitoring Report for April 2012
21 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted March, 2012 - QPCR Air Sampling
21 Water Line Repair Project LCD Completed Received/Posted February 29, 2012 - Daily Logs/Lab Reports Domestic Waterline Repair Project
21 Air Monitoring LCD Completed Received/Posted May 22, 2012 – Revised Monthly Air Monitoring Report for February 2012
21 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2012 - QPCR Air Sampling
21 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2011 - QPCR Air Sampling
21 Vinyl Composite Tile Investigation Report LaCroix Davis Completed Received/Posted January 18, 2012 - Vinyl Composite Tile Investigation Report
21 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 18, 2012 - Limited Fungal Growth Exposure Assessment Surveys - Random Air Sampling
21 Air Monitoring for Volatile Organic Compounds (VOC's) Entek Completed Received/Posted November 30, 2011 - Entek Final Report of Air Monitoring for Volatile Organic Compounds (VOC's)
21 Fungal Growth Inspection and Exposure Assessment Survey HTI Completed Received/Posted September 30, 2011 - Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation
21 Posting of Proposition 65 Warnings HTI Completed Received/Posted August 19, 2011 - Posting of Proposition 65 Warnings
21 Limited Indoor Air Quality Survey HTI Completed Received/Posted July 20, 2011 - Limited Indoor Air Quality Survey, 21st Floor Pre-Occupancy Assessment
21 21st Floor Tile and Odor Investigation Report LaCroix Davis Completed Received/Posted May 24, 2011 - 21st Floor Tile and Odor Investigation Report
21 Pre-Occupancy Assessment HTI Completed Received/Posted March 29, 2010 – Limited Indoor Air Quality Survey, 21st Floor Pre-Occupancy Assessment
21 21st Floor Fungal Growth Beneath Carpeting HTI Completed Received/Posted January 19, 2010 - 21st Floor Fungal Growth Beneath Carpeting
21 21st Floor Odor Investigation Report HTI Completed Received/Posted May 4, 2009 - 21st Floor Odor Investigation Report
21 Letter to HTI from David Gau David Gau Completed Received/Posted August 8, 2008 - Letter to HTI from David Gau
21 Restroom Assessment Report HTI Completed Received/Posted June 30, 2008 - Restroom Assessment Report
21 Cal/OHSA Notice of No Violation 5/23/08 Cal/OHSA Completed Received/Posted May 23, 2008 - Cal/OHSA Notice
21 Indoor Air Quality Assessment HTI Completed Received/Posted April 4, 2008 - HTI Report (revised)*
21 January 4, 2008 Storm Water Intrusion McGinnis Chen Completed Received/Posted January 11, 2008 Report re Storm Water Intrusions
21 Fungi Evaluation Sterling Completed Received/Posted October 29, 2007- Sterling Report
21 Air Sampling Entek Completed Received/Posted October 26, 2007 - Entek Report
21 Air sampling DGS Completed Received/Posted October 5, 2007 - MicroTest Report
21 Air sampling DGS Completed Received/Posted October 4, 2007 - MicroTest Report (3)
21 Air Sampling DGS Completed Received/Posted October 4, 2007 - MicroTest Report (2)
21 Air sampling DGS Completed Received/Posted October 4, 2007 - MicroTest Report
21 Air sampling DGS Completed Received/Posted October 3, 2007 - MicroTest Report
21 Air sampling DGS Completed Received/Posted October 3, 2007 - MicroTest Report (2)
21 Mold Evaluation Entek Completed Received/Posted June 15, 2007 - Entek Report
20 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2014 - Random Sampling
20 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2014 - Random Sampling
20 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted May 2014 – Random Sampling
20 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted April 2014 – Random Sampling
20 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2014 – QPCR Air Sampling
20 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2014 – Random Sampling
20 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2014 – Random Sampling
20 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2014 – Random Sampling
20 Quarterly Air Monitoring Report Andersen Environmental Completed Received/Posted Fourth Quarter of 2013
20 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – Random Sampling
20 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – QPCR Air Sampling
20 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2013 – Random Sampling
20 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – Random Sampling
20 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 2013 – Random Sampling
20 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2013 – Random Sampling
20 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2013 – QPCR Air Sampling
20 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted August 2013 – Random Sampling
20 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2013 – Random Sampling
20 Quarterly Air Monitoring Report Andersen Environmental Completed Received/Posted Second Quarter of 2013
20 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2013 – Random Sampling
20 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted May 2013 – Random Sampling
20 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted April 2013 Random Sampling
20 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2013 Random Sampling
20 Statistical Analysis of Monthly Air Monitoring Data for Year 2012 LCD Completed Received/Posted Statistical Analysis of Monthly Air Monitoring Data for Year 2012
20 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2013 Random Sampling
20 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2013 Random Sampling
20 Mold Remediation LCD Completed Received/Posted January 15, 2013 Revised Closure Report Addenda
20 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2012 – QPCR Air Sampling
20 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2012 Random Sampling
20 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2012 Random Sampling
20 Monthly Air Monitoring Report LCD Completed Received/Posted Monthly Air Monitoring Report November 2012
20 Mold Remediation LCD Completed Received/Posted October 31 2012 – Closure Report Addendum
20 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 2012 – QPCR Air Sampling
20 Monthly air monitoring report LCD Completed Received/Posted October16, 2012 – Monthly Air Monitoring Report September 2012
20 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2012 Random Sampling
20 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 5, 2012 - Limited Fungal Growth Exposure Assessment Surveys September 2012 Random Sampling
20 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted September 14, 2012 - Limited Fungal Growth Exposure Assessment Survey August 2012 QPCR Air Sampling
20 VCT Removal Report LCD Completed Received/Posted August 30, 2012 Vinyl Composite Tile Removal Report
20 Monthly Air Monitoring Report LCD Completed Received/Posted August 15, 2012 – Monthly Air Monitoring Report July 2012
20 Limited Drinking Water Quality Assessment HTI Completed Received/Posted December 7, 2011 - Limited Drinking Water Quality Assessment
20 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2012 Random Sampling
20 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2012 – QPCR Air Sampling
20 Monthly Air Monitoring Report LCD Completed Received/Posted June 15, 2012 - Monthly Air Monitoring Report, May 2012
20 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted May 10, 2012 - April 2012 QPCR Air Sampling
20 Monthly air monitoring report LaCroix Davis Completed Received/Posted April 12, 2012 - Monthly Monitoring Report for March 2012
20 Water Line Repair Project LCD Completed Received/Posted February 29, 2012 - Daily Logs/Lab Reports Domestic Waterline Repair Project
20 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2012 - QPCR Air Sampling
20 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2011 - QPCR Air Sampling
20 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2011 - QPCR Air Sampling
20 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 18, 2012 - Limited Fungal Growth Exposure Assessment Surveys - Random Air Sampling
20 Fungal Growth Inspection and Exposure Assessment Survey HTI Completed Received/Posted September 30, 2011 - Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation
20 Fungal Growth Remediation Monitoring and Clearance Survey HTI Completed Received/Posted December 21, 2010 - Fungal Growth Remediation Monitoring and Clearance Survey, 20th Floor
20 Limited Indoor Air Quality Survey HTI Completed Received/Posted October 14, 2010 - Limited Indoor Air Quality Survey, 20th Floor Pre-Occupancy Assessment
20 Indoor Air Quality Assessment HTI Completed Received/Posted July 3, 2008 –Limited Indoor Air Quality Survey (revised)*
20 Restroom Assessment Report HTI Completed Received/Posted June 30, 2008 - Restroom Assessment Report
20 Indoor Air Quality Assessment HTI Completed Requested/Pending  
20 Cal/OHSA Notice of No Violation 5/23/08 Cal/OHSA Completed Received/Posted May 23, 2008 - Cal/OHSA Notice
20 January 4, 2008 Storm Water Intrusion McGinnis Chen Completed Received/Posted January 11, 2008 Report re Storm Water Intrusions
20 Fungi Evaluation Sterling Completed Received/Posted October 29, 2007- Sterling Report
20 Air Sampling DGS Completed Received/Posted October 2, 2007 - MicroTest Report
20 Air sampling LaCroix Davis Completed Received/Posted January 18, 2006 - LaCroix Davis Report
19 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2014 - Random Sampling
19 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2014 - QPCR Air Sampling
19 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2014 - Random Sampling
19 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted May 2014 – Random Sampling
19 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted April 2014 – Random Sampling
19 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2014 – Random Sampling
19 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2014 – Random Sampling
19 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2014 – Random Sampling
19 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – Random Sampling
19 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – QPCR Air Sampling
19 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2013 – Random Sampling
19 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – Random Sampling
19 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 2013 – Random Sampling
19 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2013 – Random Sampling
19 Quarterly Air Monitoring Report Andersen Environmental Completed Received/Posted Third Quarter of 2013
19 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted August 2013 – Random Sampling
19 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2013 – Random Sampling
19 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2013 – Random Sampling
19 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted May 2013 – Random Sampling
19 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2013 – QPCR Air Sampling
19 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted April 2013 Random Sampling
19 Statistical Analysis of Monthly Air Monitoring Data for Year 2012 LCD Completed Received/Posted Statistical Analysis of Monthly Air Monitoring Data for Year 2012
19 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2013 Random Sampling
19 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2013 Random Sampling
19 Mold Remediation LCD Completed Received/Posted January 15, 2013 Revised Closure Report Addenda
19 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2012 Random Sampling
19 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2012 Random Sampling
19 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2012 – QPCR Air Sampling
19 Monthly Air Monitoring Report LCD Completed Received/Posted November 19, 2012 – Monthly Air Monitoring Report October 2012
19 Mold Remediation LCD Completed Received/Posted October 31 2012 – Closure Report Addendum
19 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 2012 – QPCR Air Sampling
19 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted October 22, 2012 - Limited Fungal Growth Exposure Assessment Survey September 2012 QPCR Air Sampling
19 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2012 Random Sampling
19 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 5, 2012 - Limited Fungal Growth Exposure Assessment Surveys September 2012 Random Sampling
19 Monthly Air Monitoring Report LCD Completed Received/Posted September 19, 2012 – Monthly Air Monitoring Report August 2012
19 VCT Removal Report LCD Completed Received/Posted August 30, 2012 Vinyl Composite Tile Removal Report
19 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2012 QPCR Air Sampling
19 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2012 Random Sampling
19 Monthly Air Monitoring Report LCD Completed Received/Posted July 18, 2012 - Monthly Air Monitoring Report for June 2012
19 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted June 11, 2012 - May 2012 QPCR Air Sampling
19 Air Monitoring Report LCD Completed Received/Posted May 22, 2012 - Monthly Air Monitoring Report for April 2012
19 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted March, 2012 - QPCR Air Sampling
19 Water Line Repair Project LCD Completed Received/Posted February 29, 2012 - Daily Logs/Lab Reports Domestic Waterline Repair Project
19 Air Monitoring LCD Completed Received/Posted May 22, 2012 – Revised Monthly Air Monitoring Report for February 2012
19 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2012 - QPCR Air Sampling
19 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2011 - QPCR Air Sampling
19 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 18, 2012 - Limited Fungal Growth Exposure Assessment Surveys - Random Air Sampling
19 Limited Drinking Water Quality Assessment HTI Completed Received/Posted January 6, 2012 - Limited Drinking Water Quality Assessment
19 Air Monitoring for Volatile Organic Compounds (VOC's) Entek Completed Received/Posted November 30, 2011 - Entek Final Report of Air Monitoring for Volatile Organic Compounds (VOC's)
19 Fungal Growth Inspection and Exposure Assessment Survey HTI Completed Received/Posted September 30, 2011 - Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation
19 Posting of Proposition 65 Warnings HTI Completed Received/Posted August 19, 2011 - Posting of Proposition 65 Warnings
19 Limited Indoor Air Quality Survey HTI Completed Received/Posted February 11, 2011 - 19th Floor Pre-Occupancy Assessment
19 Indoor Air Quality Assessment HTI Completed Received/Posted August 20, 2008 - Limited Indoor Air Quality Survey
19 Restroom Assessment Report HTI Completed Received/Posted June 30, 2008 - Restroom Assessment Report
19 Odor Investigation Report LaCroix Davis Completed Received/Posted May 24, 2011 - 19th Floor Tile and Odor Investigation Report
19 Cal/OHSA Notice of No Violation 5/23/08 Cal/OHSA Completed Received/Posted May 23, 2008 - Cal/OHSA Notice
19 January 4, 2008 Storm Water Intrusion McGinnis Chen Completed Received/Posted January 11, 2008 Report re Storm Water Intrusions
19 Air sampling DGS Completed Received/Posted October 3, 2007 - MicroTest Report
19 Air sampling DGS Completed Received/Posted October 3, 2007 - MicroTest Report (2)
19 Air Sampling DGS Completed Received/Posted October 2, 2007 - MicroTest Report
18 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2014 - Random Sampling
18 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2014 - Random Sampling
18 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted May 2014 – Random Sampling
18 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted April 2014 – Random Sampling
18 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2014 – QPCR Air Sampling
18 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2014 – Random Sampling
18 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2014 – Random Sampling
18 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2014 – Random Sampling
18 Quarterly Air Monitoring Report Andersen Environmental Completed Received/Posted Fourth Quarter of 2013
18 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – Random Sampling
18 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – QPCR Air Sampling
18 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2013 – Random Sampling
18 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – Random Sampling
18 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 2013 – Random Sampling
18 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2013 – Random Sampling
18 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2013 – QPCR Air Sampling
18 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted August 2013 – Random Sampling
18 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2013 – Random Sampling
18 Quarterly Air Monitoring Report Andersen Environmental Completed Received/Posted Second Quarter of 2013
18 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2013 – Random Sampling
18 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted May 2013 – Random Sampling
18 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted April 2013 Random Sampling
18 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2013 Random Sampling
18 Statistical Analysis of Monthly Air Monitoring Data for Year 2012 LCD Completed Received/Posted Statistical Analysis of Monthly Air Monitoring Data for Year 2012
18 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2013 Random Sampling
18 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2013 Random Sampling
18 Mold Remediation LCD Completed Received/Posted January 15, 2013 Revised Closure Report Addenda
18 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2012 – QPCR Air Sampling
18 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2012 Random Sampling
18 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2012 Random Sampling
18 Monthly Air Monitoring Report LCD Completed Received/Posted Monthly Air Monitoring Report November 2012
18 Mold Remediation LCD Completed Received/Posted October 31 2012 – Closure Report Addendum
18 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 2012 – QPCR Air Sampling
18 Monthly air monitoring report LCD Completed Received/Posted October16, 2012 – Monthly Air Monitoring Report September 2012
18 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2012 Random Sampling
18 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 5, 2012 - Limited Fungal Growth Exposure Assessment Surveys September 2012 Random Sampling
18 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted September 14, 2012 - Limited Fungal Growth Exposure Assessment Survey August 2012 QPCR Air Sampling
18 Monthly Air Monitoring Report LCD Completed Received/Posted August 15, 2012 – Monthly Air Monitoring Report July 2012
18 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2012 Random Sampling
18 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2012 – QPCR Air Sampling
18 Monthly Air Monitoring Report LCD Completed Received/Posted June 15, 2012 - Monthly Air Monitoring Report, May 2012
18 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted May 10, 2012 - April 2012 QPCR Air Sampling
18 Monthly air monitoring report LaCroix Davis Completed Received/Posted April 12, 2012 - Monthly Monitoring Report for March 2012
18 Water Line Repair Project LCD Completed Received/Posted February 29, 2012 - Daily Logs/Lab Reports Domestic Waterline Repair Project
18 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2012 - QPCR Air Sampling
18 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2011 - QPCR Air Sampling
18 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2011 - QPCR Air Sampling
18 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 18, 2012 - Limited Fungal Growth Exposure Assessment Surveys - Random Air Sampling
18 Fungal Growth Inspection and Exposure Assessment Survey HTI Completed Received/Posted September 30, 2011 - Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation
18 Indoor Air Quality Assessment HTI Completed Received/Posted April 2, 2010 – Limited Indoor Air Quality Survey, 18th Floor Pre-Occupancy Assessment
18 Indoor Air Quality Survey HTI Completed Received/Posted September 8, 2008 -
18 Restroom Assessment Report HTI Completed Received/Posted June 30, 2008 - Restroom Assessment Report
18 Indoor Air Quality Assessment HTI Completed Requested/Pending  
18 Cal/OHSA Notice of No Violation 5/23/08 Cal/OHSA Completed Received/Posted May 23, 2008 - Cal/OHSA Notice
18 January 4, 2008 Storm Water Intrusion McGinnis Chen Completed Received/Posted January 11, 2008 Report re Storm Water Intrusions
18 Air Sampling DGS Completed Received/Posted October 2, 2007 - MicroTest Report
18 Mold Evaluation Entek Completed Received/Posted June 15, 2007 - Entek Report
18 Air sampling LaCroix Davis Completed Received/Posted January 18, 2006 - LaCroix Davis Report
17 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2014 - Random Sampling
17 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2014 - QPCR Air Sampling
17 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2014 - Random Sampling
17 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted May 2014 – Random Sampling
17 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted April 2014 – Random Sampling
17 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2014 – Random Sampling
17 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2014 – Random Sampling
17 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2014 – Random Sampling
17 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – Random Sampling
17 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – QPCR Air Sampling
17 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2013 – Random Sampling
17 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – Random Sampling
17 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 2013 – Random Sampling
17 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2013 – Random Sampling
17 Quarterly Air Monitoring Report Andersen Environmental Completed Received/Posted Third Quarter of 2013
17 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted August 2013 – Random Sampling
17 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2013 – Random Sampling
17 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2013 – Random Sampling
17 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted May 2013 – Random Sampling
17 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2013 – QPCR Air Sampling
17 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted April 2013 Random Sampling
17 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2013 Random Sampling
17 Statistical Analysis of Monthly Air Monitoring Data for Year 2012 LCD Completed Received/Posted Statistical Analysis of Monthly Air Monitoring Data for Year 2012
17 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2013 Random Sampling
17 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2013 Random Sampling
17 Mold Remediation LCD Completed Received/Posted January 15, 2013 Revised Closure Report Addenda
17 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2012 Random Sampling
17 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2012 Random Sampling
17 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2012 – QPCR Air Sampling
17 Monthly Air Monitoring Report LCD Completed Received/Posted November 19, 2012 – Monthly Air Monitoring Report October 2012
17 Mold Remediation LCD Completed Received/Posted October 31 2012 – Closure Report Addendum
17 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 2012 – QPCR Air Sampling
17 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted October 22, 2012 - Limited Fungal Growth Exposure Assessment Survey September 2012 QPCR Air Sampling
17 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2012 Random Sampling
17 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 5, 2012 - Limited Fungal Growth Exposure Assessment Surveys September 2012 Random Sampling
17 Monthly Air Monitoring Report LCD Completed Received/Posted September 19, 2012 – Monthly Air Monitoring Report August 2012
17 VCT Removal Report LCD Completed Received/Posted August 30, 2012 Vinyl Composite Tile Removal Report
17 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2012 QPCR Air Sampling
17 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2012 Random Sampling
17 Monthly Air Monitoring Report LCD Completed Received/Posted July 18, 2012 - Monthly Air Monitoring Report for June 2012
17 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted June 11, 2012 - May 2012 QPCR Air Sampling
17 Air Monitoring Report LCD Completed Received/Posted May 22, 2012 - Monthly Air Monitoring Report for April 2012
17 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted March, 2012 - QPCR Air Sampling
17 Water Line Repair Project LCD Completed Received/Posted February 29, 2012 - Daily Logs/Lab Reports Domestic Waterline Repair Project
17 Air Monitoring LCD Completed Received/Posted May 22, 2012 – Revised Monthly Air Monitoring Report for February 2012
17 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2012 - QPCR Air Sampling
17 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2011 - QPCR Air Sampling
17 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 18, 2012 - Limited Fungal Growth Exposure Assessment Surveys - Random Air Sampling
17 Fungal Growth Inspection and Exposure Assessment Survey HTI Completed Received/Posted September 30, 2011 - Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation
17 Limited Indoor Air Quality Survey HTI Completed Received/Posted January 21, 2011 - 17th Floor Pre-Occupancy Assessment
17 Restroom Assessment Report HTI Completed Received/Posted June 30, 2008 - Restroom Assessment Report
17 Indoor Air Quality Assessment HTI Completed Received/Posted July 25, 2008 - Limited Indoor Air Quality Survey
17 Cal/OHSA Notice of No Violation 5/23/08 Cal/OHSA Completed Received/Posted May 23, 2008 - Cal/OHSA Notice
17 January 4, 2008 Storm Water Intrusion McGinnis Chen Completed Received/Posted January 11, 2008 - Report re Storm Water Intrusions
17 Fungi Evaluation Sterling Completed Received/Posted October 29, 2007- Sterling Report
17 Air Sampling DGS Completed Received/Posted October 2, 2007 - MicroTest Report
16 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2014 - Random Sampling
16 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2014 - Random Sampling
16 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted May 2014 – Random Sampling
16 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted April 2014 – Random Sampling
16 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2014 – QPCR Air Sampling
16 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2014 – Random Sampling
16 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2014 – Random Sampling
16 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2014 – Random Sampling
16 Quarterly Air Monitoring Report Andersen Environmental Completed Received/Posted Fourth Quarter of 2013
16 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – Random Sampling
16 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – QPCR Air Sampling
16 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2013 – Random Sampling
16 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – Random Sampling
16 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 2013 – Random Sampling
16 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2013 – Random Sampling
16 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2013 – QPCR Air Sampling
16 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted August 2013 – Random Sampling
16 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2013 – Random Sampling
16 Quarterly Air Monitoring Report Andersen Environmental Completed Received/Posted Second Quarter of 2013
16 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2013 – Random Sampling
16 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted May 2013 – Random Sampling
16 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted April 2013 Random Sampling
16 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2013 Random Sampling
16 Statistical Analysis of Monthly Air Monitoring Data for Year 2012 LCD Completed Received/Posted Statistical Analysis of Monthly Air Monitoring Data for Year 2012
16 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2013 Random Sampling
16 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2013 Random Sampling
16 Mold Remediation LCD Completed Received/Posted January 15, 2013 Revised Closure Report Addenda
16 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2012 – QPCR Air Sampling
16 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2012 Random Sampling
16 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2012 Random Sampling
16 Monthly Air Monitoring Report LCD Completed Received/Posted Monthly Air Monitoring Report November 2012
16 Mold Remediation LCD Completed Received/Posted October 31 2012 – Closure Report Addendum
16 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 2012 – QPCR Air Sampling
16 Monthly air monitoring report LCD Completed Received/Posted October16, 2012 – Monthly Air Monitoring Report September 2012
16 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2012 Random Sampling
16 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 5, 2012 - Limited Fungal Growth Exposure Assessment Surveys September 2012 Random Sampling
16 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted September 14, 2012 - Limited Fungal Growth Exposure Assessment Survey August 2012 QPCR Air Sampling
16 Monthly Air Monitoring Report LCD Completed Received/Posted August 15, 2012 – Monthly Air Monitoring Report July 2012
16 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2012 Random Sampling
16 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2012 – QPCR Air Sampling
16 Monthly Air Monitoring Report LCD Completed Received/Posted June 15, 2012 - Monthly Air Monitoring Report, May 2012
16 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted May 10, 2012 - April 2012 QPCR Air Sampling
16 Monthly air monitoring report LaCroix Davis Completed Received/Posted April 12, 2012 - Monthly Monitoring Report for March 2012
16 Water Line Repair Project LCD Completed Received/Posted February 29, 2012 - Daily Logs/Lab Reports Domestic Waterline Repair Project
16 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2012 - QPCR Air Sampling
16 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2011 - QPCR Air Sampling
16 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2011 - QPCR Air Sampling
16 Fungal Growth Inspection and Exposure Assessment Survey HTI Completed Received/Posted September 30, 2011 - Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation
16 Fungal Growth Remediation Monitoring and Clearance Surveys HTI Completed Received/Posted July 30, 2010 - Fungal Growth Remediation Monitoring and Clearance Surveys
16 Indoor Air Quality Assessment HTI Completed Received/Posted April 2, 2010 – Limited Indoor Air Quality Survey, 16th Floor Pre-Occupancy Assessment
16 Restroom Assessment Report HTI Completed Received/Posted June 30, 2008 - Restroom Assessment Report
16 Indoor Air Quality Assessment HTI Completed Received/Posted September 11, 2008 - Limited Indoor Air Quality Survey
16 Cal/OHSA Notice of No Violation 5/23/08 Cal/OHSA Completed Received/Posted May 23, 2008 - Cal/OHSA Notice
16 January 4, 2008 Storm Water Intrusion McGinnis Chen Completed Received/Posted January 11, 2008 Report re Storm Water Intrusions
16 Air Sampling DGS Completed Received/Posted October 2, 2007 - MicroTest Report
15 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2014 - Random Sampling
15 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2014 - QPCR Air Sampling
15 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2014 - Random Sampling
15 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted May 2014 – Random Sampling
15 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted April 2014 – Random Sampling
15 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2014 – Random Sampling
15 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2014 – Random Sampling
15 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2014 – Random Sampling
15 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – Random Sampling
15 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – QPCR Air Sampling
15 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2013 – Random Sampling
15 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – Random Sampling
15 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 2013 – Random Sampling
15 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2013 – Random Sampling
15 Quarterly Air Monitoring Report Andersen Environmental Completed Received/Posted Third Quarter of 2013
15 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted August 2013 – Random Sampling
15 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2013 – Random Sampling
15 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2013 – Random Sampling
15 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted May 2013 – Random Sampling
15 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2013 – QPCR Air Sampling
15 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted April 2013 Random Sampling
15 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2013 Random Sampling
15 Statistical Analysis of Monthly Air Monitoring Data for Year 2012 LCD Completed Received/Posted Statistical Analysis of Monthly Air Monitoring Data for Year 2012
15 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2013 Random Sampling
15 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2013 Random Sampling
15 Mold Remediation LCD Completed Received/Posted January 15, 2013 Revised Closure Report Addenda
15 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2012 Random Sampling
15 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2012 Random Sampling
15 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2012 – QPCR Air Sampling
15 Monthly Air Monitoring Report LCD Completed Received/Posted November 19, 2012 – Monthly Air Monitoring Report October 2012
15 Mold Remediation LCD Completed Received/Posted October 31 2012 – Closure Report Addendum
15 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 2012 – QPCR Air Sampling
15 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted October 22, 2012 - Limited Fungal Growth Exposure Assessment Survey September 2012 QPCR Air Sampling
15 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2012 Random Sampling
15 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 5, 2012 - Limited Fungal Growth Exposure Assessment Surveys September 2012 Random Sampling
15 Monthly Air Monitoring Report LCD Completed Received/Posted September 19, 2012 – Monthly Air Monitoring Report August 2012
15 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2012 QPCR Air Sampling
15 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2012 Random Sampling
15 Monthly Air Monitoring Report LCD Completed Received/Posted July 18, 2012 - Monthly Air Monitoring Report for June 2012
15 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted June 11, 2012 - May 2012 QPCR Air Sampling
15 Air Monitoring Report LCD Completed Received/Posted May 22, 2012 - Monthly Air Monitoring Report for April 2012
15 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted March, 2012 - QPCR Air Sampling
15 Water Line Repair Project LCD Completed Received/Posted February 29, 2012 - Daily Logs/Lab Reports Domestic Waterline Repair Project
15 Air Monitoring LCD Completed Received/Posted May 22, 2012 – Revised Monthly Air Monitoring Report for February 2012
15 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2012 - QPCR Air Sampling
15 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2011 - QPCR Air Sampling
15 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 18, 2012 - Limited Fungal Growth Exposure Assessment Surveys - Random Air Sampling
15 Fungal Growth Inspection and Exposure Assessment Survey HTI Completed Received/Posted September 30, 2011 - Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation
15 Fungal Growth Remediation Monitoring and Clearance HTI Completed Received/Posted July 29, 2010 - Fungal Growth Remediation Monitoring and Clearance Surveys
15 Indoor Air Quality Assessment HTI Completed Received/Posted April 2, 2010 – Limited Indoor Air Quality Survey, 15th Floor Pre-Occupancy Assessment
15 Restroom Assessment Report HTI Completed Received/Posted June 30, 2008 - Restroom Assessment Report
15 Indoor Air Quality Assessment HTI Completed Received/Posted June 13, 2008 - Indoor Air Quality Survey (revised)*
15 Cal/OHSA Notice of No Violation 5/23/08 Cal/OHSA Completed Received/Posted May 23, 2008 - Cal/OHSA Notice
15 January 4, 2008 Storm Water Intrusion McGinnis Chen Completed Received/Posted January 11, 2008 Report re Storm Water Intrusions
15 Air Sampling DGS Completed Received/Posted October 2, 2007 - MicroTest Report
15 Air sampling LaCroix Davis Completed Posted January 18, 2006 - LaCroix Davis Report
14 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2014 - Random Sampling
14 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2014 - Random Sampling
14 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted May 2014 – Random Sampling
14 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted April 2014 – Random Sampling
14 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2014 – QPCR Air Sampling
14 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2014 – Random Sampling
14 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2014 – Random Sampling
14 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2014 – Random Sampling
14 Quarterly Air Monitoring Report Andersen Environmental Completed Received/Posted Fourth Quarter of 2013
14 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – Random Sampling
14 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2013 – Random Sampling
14 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – Random Sampling
14 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 2013 – Random Sampling
14 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2013 – Random Sampling
14 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2013 – QPCR Air Sampling
14 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted August 2013 – Random Sampling
14 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2013 – Random Sampling
14 Quarterly Air Monitoring Report Andersen Environmental Completed Received/Posted Second Quarter of 2013
14 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2013 – Random Sampling
14 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted May 2013 – Random Sampling
14 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted April 2013 Random Sampling
14 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2013 Random Sampling
14 Statistical Analysis of Monthly Air Monitoring Data for Year 2012 LCD Completed Received/Posted Statistical Analysis of Monthly Air Monitoring Data for Year 2012
14 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2013 Random Sampling
14 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2013 Random Sampling
14 Mold Remediation LCD Completed Received/Posted January 15, 2013 Revised Closure Report Addenda
14 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2012 – QPCR Air Sampling
14 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2012 Random Sampling
14 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2012 Random Sampling
14 Monthly Air Monitoring Report LCD Completed Received/Posted Monthly Air Monitoring Report November 2012
14 Mold Remediation LCD Completed Received/Posted October 31 2012 – Closure Report Addendum
14 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 2012 – QPCR Air Sampling
14 Monthly air monitoring report LCD Completed Received/Posted October16, 2012 – Monthly Air Monitoring Report September 2012
14 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2012 Random Sampling
14 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 5, 2012 - Limited Fungal Growth Exposure Assessment Surveys September 2012 Random Sampling
14 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted September 14, 2012 - Limited Fungal Growth Exposure Assessment Survey August 2012 QPCR Air Sampling
14 VCT Removal Report LCD Completed Received/Posted August 30, 2012 Vinyl Composite Tile Removal Report
14 Monthly Air Monitoring Report LCD Completed Received/Posted August 15, 2012 – Monthly Air Monitoring Report July 2012
14 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2012 Random Sampling
14 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2012 – QPCR Air Sampling
14 Monthly Air Monitoring Report LCD Completed Received/Posted June 15, 2012 - Monthly Air Monitoring Report, May 2012
14 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted May 10, 2012 - April 2012 QPCR Air Sampling
14 Monthly air monitoring report LaCroix Davis Completed Received/Posted April 12, 2012 - Monthly Monitoring Report for March 2012
14 Water Line Repair Project LCD Completed Received/Posted February 29, 2012 - Daily Logs/Lab Reports Domestic Waterline Repair Project
14 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2012 - QPCR Air Sampling
14 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2011 - QPCR Air Sampling
14 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2011 - QPCR Air Sampling
14 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 18, 2012 - Limited Fungal Growth Exposure Assessment Surveys - Random Air Sampling
14 Fungal Growth Inspection and Exposure Assessment Survey HTI Completed Received/Posted September 30, 2011 - Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation
14 Fungal Growth Abatement Monitoring HTI Completed Received/Posted July 23, 2010 - Fungal Growth Abatement Monitoring and Fungal Growth Abatement Clearance Surveys, 14th Floor
14 14TH Floor Pre-Occupancy Assessment HTI Completed Received/Posted October 20, 2009 - Limited Indoor Air Quality Survey, 14th Floor Pre-Occupancy Assessment
14 Indoor Air Quality Assessment HTI Completed Received/Posted September 15, 2008 - Limited Indoor Air Quality Survey
14 Restroom Assessment Report HTI Completed Received/Posted June 30, 2008 - Restroom Assessment Report
14 Cal/OHSA Notice of No Violation 5/23/08 Cal/OHSA Completed Received/Posted May 23, 2008 - Cal/OHSA Notice
14 January 4, 2008 Storm Water Intrusion McGinnis Chen Completed Received/Posted January 11, 2008 Report re Storm Water Intrusions
14 Fungi Evaluation Sterling Completed Received/Posted October 29, 2007- Sterling Report
14 Air Sampling DGS Completed Received/Posted October 2, 2007 - MicroTest Report
Mezzanine Quarterly Air Monitoring Report Andersen Environmental Completed Received/Posted Second Quarter of 2013
Mezzanine Mold Remediation LCD Completed Received/Posted January 15, 2013 Revised Closure Report Addenda
Mezzanine Mold Remediation LCD Completed Received/Posted October 31 2012 – Closure Report Addendum
Mezzanine HVAC System Investigation LaCroix Davis Completed Received/Posted June 5, 2012 - Heating, Ventilation and Air Conditioning (HVAC) System Investigation
Mezzanine Water Line Repair Project LCD Completed Received/Posted February 29, 2012 - Daily Logs/Lab Reports Domestic Waterline Repair Project
Mezzanine Air Monitoring LCD Completed Received/Posted May 22, 2012 – Revised Monthly Air Monitoring Report for February 2012
Mezzanine Asbestos and Lead Based Paint Survey LaCroix Davis Completed Received/Posted February 29, 2012 - Asbestos and Lead Based Paint Survey
Mezzanine Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2012 - QPCR Air Sampling
Mezzanine Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2012 - QPCR Air Sampling
Mezzanine Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2011 - QPCR Air Sampling
Mezzanine Limited Drinking Water Quality Assessment HTI Completed Received/Posted January 6, 2012 - Limited Drinking Water Quality Assessment
Mezzanine Fungal Growth Inspection and Exposure Assessment Survey HTI Completed Received/Posted September 30, 2011 - Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation
Mezzanine Response to July 22 DGS Memo HTI Completed Received/Posted August 3, 2011 - Response to California Department of General Services Letter Dated July 22, 2011
Mezzanine Mechanical Duct Testing Results DGS Completed Received/Posted July 22, 2011 – Mechanical Duct Testing Results, M Floor Supply Fans 3 and 4
Mezzanine Fungal Growth Inspection and Exposure Assessment Survey HTI Completed Received/Posted July 15, 2011 - Fungal Growth Inspection and Exposure Assessment Surveys M Floor Supply Fans 3 & 4
Mezzanine Fungal Growth Remediation Monitoring and Exposure Assessment Survey HTI Completed Received/Posted May 25, 2011 - Fungal Growth Remediation Monitoring and Exposure Assessment Survey, M Floor Supply Fans 1 & 2 Room
Mezzanine Fungal Growth Remediation Monitoring and Exposure Assessment Survey HTI Completed Received/Posted April 21, 2011 - Fungal Growth Remediation Monitoring and Exposure Assessment Surveys, M Floor Supply Fans 3 & 4 Room
11 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2014 - Random Sampling
11 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2014 - QPCR Air Sampling
11 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2014 - Random Sampling
11 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted May 2014 – Random Sampling
11 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted April 2014 – Random Sampling
11 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2014 – Random Sampling
11 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2014 – Random Sampling
11 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2014 – Random Sampling
11 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – Random Sampling
11 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – QPCR Air Sampling
11 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2013 – Random Sampling
11 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – Random Sampling
11 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 2013 – Random Sampling
11 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2013 – Random Sampling
11 Quarterly Air Monitoring Report Andersen Environmental Completed Received/Posted Third Quarter of 2013
11 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted August 2013 – Random Sampling
11 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2013 – Random Sampling
11 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2013 – Random Sampling
11 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted May 2013 – Random Sampling
11 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2013 – QPCR Air Sampling
11 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted April 2013 Random Sampling
11 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2013 Random Sampling
11 Statistical Analysis of Monthly Air Monitoring Data for Year 2012 LCD Completed Received/Posted Statistical Analysis of Monthly Air Monitoring Data for Year 2012
11 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2013 Random Sampling
11 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2013 Random Sampling
11 Mold Remediation LCD Completed Received/Posted January 15, 2013 Revised Closure Report Addenda
11 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2012 Random Sampling
11 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2012 Random Sampling
11 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2012 – QPCR Air Sampling
11 Monthly Air Monitoring Report LCD Completed Received/Posted November 19, 2012 – Monthly Air Monitoring Report October 2012
11 Mold Remediation LCD Completed Received/Posted October 31 2012 – Closure Report Addendum
11 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 2012 – QPCR Air Sampling
11 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted October 22, 2012 - Limited Fungal Growth Exposure Assessment Survey September 2012 QPCR Air Sampling
11 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2012 Random Sampling
11 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 5, 2012 - Limited Fungal Growth Exposure Assessment Surveys September 2012 Random Sampling
11 Monthly Air Monitoring Report LCD Completed Received/Posted September 19, 2012 – Monthly Air Monitoring Report August 2012
11 VCT Removal Report LCD Completed Received/Posted August 30, 2012 Vinyl Composite Tile Removal Report
11 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2012 QPCR Air Sampling
11 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2012 Random Sampling
11 Monthly Air Monitoring Report LCD Completed Received/Posted July 18, 2012 - Monthly Air Monitoring Report for June 2012
11 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted June 11, 2012 - May 2012 QPCR Air Sampling
11 Air Monitoring Report LCD Completed Received/Posted May 22, 2012 - Monthly Air Monitoring Report for April 2012
11 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted March, 2012 - QPCR Air Sampling
11 Water Line Repair Project LCD Completed Received/Posted February 29, 2012 - Daily Logs/Lab Reports Domestic Waterline Repair Project
11 Air Monitoring LCD Completed Received/Posted May 22, 2012 – Revised Monthly Air Monitoring Report for February 2012
11 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2012 - QPCR Air Sampling
11 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2011 - QPCR Air Sampling
11 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 18, 2012 - Limited Fungal Growth Exposure Assessment Surveys - Random Air Sampling
11 Fungal Growth Inspection and Exposure Assessment Survey HTI Completed Received/Posted September 30, 2011 - Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation
11 11TH Floor Pre-Occupancy Assessment HTI Completed Received/Posted October 16, 2009 - Limited Indoor Air Quality Survey - 11TH Floor Pre-Occupancy Assessment
11 Restroom Assessment Report HTI Completed Received/Posted June 30, 2008 - Restroom Assessment Report
11 Indoor Air Quality Assessment, 11th Floor HTI Completed Received/Posted June 19, 2008 -- Limited Indoor Air Quality Survey, 11th Floor (revised)*
11 Indoor Air Quality Assessment HTI Completed Requested/Pending  
11 12th Floor Pipe Leak HTI
11 Cal/OHSA Notice of No Violation 5/23/08 Cal/OHSA Completed Received/Posted May 23, 2008 - Cal/OHSA Notice
11 January 4, 2008 Storm Water Intrusion McGinnis Chen Completed Received/Posted January 11, 2008 Report re Storm Water Intrusions
11 Fungi Evaluation Sterling Completed Received/Posted October 29, 2007- Sterling Report
11 Air Sampling Entek Completed Received/Posted October 26, 2007 - Entek Report
11 Air sampling DGS Completed Received/Posted October 5, 2007 - MicroTest Report
11 Air sampling DGS Completed Received/Posted October 4, 2007 - MicroTest Report (3)
11 Air sampling DGS Completed Received/Posted October 4, 2007 - MicroTest Report
11 Air sampling DGS Completed Received/Posted October 3, 2007 - MicroTest Report
11 Air sampling DGS Completed Received/Posted October 3, 2007 - MicroTest Report (2)
11 Air Sampling DGS Completed Received/Posted October 2, 2007 - MicroTest Report
11 Air sampling LaCroix Davis Completed Received/Posted January 18, 2006 - LaCroix Davis Report
11 Air sampling DGS Completed Received/Posted November 4, 2004 - DGS Report
11 Air sampling DGS Completed Received/Posted July 20, 2004 - DGS Report
10 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2014 - Random Sampling
10 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2014 - Random Sampling
10 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted May 2014 – Random Sampling
10 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted April 2014 – Random Sampling
10 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2014 – QPCR Air Sampling
10 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2014 – Random Sampling
10 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2014 – Random Sampling
10 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2014 – Random Sampling
10 Quarterly Air Monitoring Report Andersen Environmental Completed Received/Posted Fourth Quarter of 2013
10 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – Random Sampling
10 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – QPCR Air Sampling
10 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2013 – Random Sampling
10 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – Random Sampling
10 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 2013 – Random Sampling
10 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2013 – Random Sampling
10 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2013 – QPCR Air Sampling
10 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted August 2013 – Random Sampling
10 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2013 – Random Sampling
10 Quarterly Air Monitoring Report Andersen Environmental Completed Received/Posted Second Quarter of 2013
10 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2013 – Random Sampling
10 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted May 2013 – Random Sampling
10 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted April 2013 Random Sampling
10 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2013 Random Sampling
10 Statistical Analysis of Monthly Air Monitoring Data for Year 2012 LCD Completed Received/Posted Statistical Analysis of Monthly Air Monitoring Data for Year 2012
10 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2013 Random Sampling
10 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2013 Random Sampling
10 Mold Remediation LCD Completed Received/Posted January 15, 2013 Revised Closure Report Addenda
10 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2012 – QPCR Air Sampling
10 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2012 Random Sampling
10 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2012 Random Sampling
10 Monthly Air Monitoring Report LCD Completed Received/Posted Monthly Air Monitoring Report November 2012
10 Mold Remediation LCD Completed Received/Posted October 31 2012 – Closure Report Addendum
10 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 2012 – QPCR Air Sampling
10 Monthly air monitoring report LCD Completed Received/Posted October16, 2012 – Monthly Air Monitoring Report September 2012
10 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2012 Random Sampling
10 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 5, 2012 - Limited Fungal Growth Exposure Assessment Surveys September 2012 Random Sampling
10 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted September 14, 2012 - Limited Fungal Growth Exposure Assessment Survey August 2012 QPCR Air Sampling
10 Monthly Air Monitoring Report LCD Completed Received/Posted August 15, 2012 – Monthly Air Monitoring Report July 2012
10 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2012 Random Sampling
10 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2012 – QPCR Air Sampling
10 Monthly Air Monitoring Report LCD Completed Received/Posted June 15, 2012 - Monthly Air Monitoring Report, May 2012
10 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted May 10, 2012 - April 2012 QPCR Air Sampling
10 Monthly air monitoring report LaCroix Davis Completed Received/Posted April 12, 2012 - Monthly Monitoring Report for March 2012
10 Water Line Repair Project LCD Completed Received/Posted February 29, 2012 - Daily Logs/Lab Reports Domestic Waterline Repair Project
10 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2012 - QPCR Air Sampling
10 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2011 - QPCR Air Sampling
10 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2011 - QPCR Air Sampling
10 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 18, 2012 - Limited Fungal Growth Exposure Assessment Surveys - Random Air Sampling
10 Fungal Growth Inspection and Exposure Assessment Survey HTI Completed Received/Posted September 30, 2011 - Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation
10 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted May 6, 2011 - Limited Fungal Growth Exposure Assessment Survey, 10th Floor
10 Fungal Growth Remediation Monitoring Clearance Surveys HTI Completed Received/Posted August 18, 2010 – 10th Floor Fungal Growth Remediation Monitoring Clearance Surveys
10 Limited Indoor Air Quality Survey HTI Completed Received/Posted June 30, 2010 - 10th Floor Pre-Occupancy Assessment
10 Indoor Air Quality Assessment HTI Completed Received/Posted July 31, 2008 – Limited Indoor Air Quality Survey
10 Restroom Assessment Report HTI Completed Received/Posted June 30, 2008 - Restroom Assessment Report
10 Cal/OHSA Notice of No Violation 5/23/08 Cal/OHSA Completed Received/Posted May 23, 2008 - Cal/OHSA Notice
10 Air Sampling Report HTI Completed Received/Posted February 29, 2008 - 10th Floor Break Room
10 Breakroom Health Impact Munday Completed Received/Posted February 6, 2008 Munday Report
10 Break Room Air Sampling HTI Completed Received/Posted February 1, 2008 HTI Report
10 January 4, 2008 Storm Water Intrusion McGinnis Chen Completed Received/Posted January 11, 2008 Report re Storm Water Intrusions
10 Air Sampling DGS Completed Received/Posted October 2, 2007 - MicroTest Report
9 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2014 - Random Sampling
9 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2014 - QPCR Air Sampling
9 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2014 - Random Sampling
9 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted May 2014 – Random Sampling
9 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted April 2014 – Random Sampling
9 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2014 – Random Sampling
9 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2014 – Random Sampling
9 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2014 – Random Sampling
9 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – Random Sampling
9 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – QPCR Air Sampling
9 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2013 – Random Sampling
9 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – Random Sampling
9 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 2013 – Random Sampling
9 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2013 – Random Sampling
9 Quarterly Air Monitoring Report Andersen Environmental Completed Received/Posted Third Quarter of 2013
9 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted August 2013 – Random Sampling
9 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2013 – Random Sampling
9 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2013 – Random Sampling
9 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted May 2013 – Random Sampling
9 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2013 – QPCR Air Sampling
9 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted April 2013 Random Sampling
9 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2013 Random Sampling
9 Statistical Analysis of Monthly Air Monitoring Data for Year 2012 LCD Completed Received/Posted Statistical Analysis of Monthly Air Monitoring Data for Year 2012
9 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2013 Random Sampling
9 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2013 Random Sampling
9 Mold Remediation LCD Completed Received/Posted January 15, 2013 Revised Closure Report Addenda
9 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2012 Random Sampling
9 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2012 Random Sampling
9 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2012 – QPCR Air Sampling
9 Monthly Air Monitoring Report LCD Completed Received/Posted November 19, 2012 – Monthly Air Monitoring Report October 2012
9 Mold Remediation LCD Completed Received/Posted October 31 2012 – Closure Report Addendum
9 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 2012 – QPCR Air Sampling
9 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted October 22, 2012 - Limited Fungal Growth Exposure Assessment Survey September 2012 QPCR Air Sampling
9 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2012 Random Sampling
9 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 5, 2012 - Limited Fungal Growth Exposure Assessment Surveys September 2012 Random Sampling
9 Monthly Air Monitoring Report LCD Completed Received/Posted September 19, 2012 – Monthly Air Monitoring Report August 2012
9 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2012 QPCR Air Sampling
9 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2012 Random Sampling
9 Monthly Air Monitoring Report LCD Completed Received/Posted July 18, 2012 - Monthly Air Monitoring Report for June 2012
9 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted June 11, 2012 - May 2012 QPCR Air Sampling
9 Air Monitoring Report LCD Completed Received/Posted May 22, 2012 - Monthly Air Monitoring Report for April 2012
9 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted March, 2012 - QPCR Air Sampling
9 Fungal Growth Remediation Monitoring and Clearance Surveys HTI Completed Received/Posted April 4, 2012 - 9th Floor Storage Room 9D
9 Water Line Repair Project LCD Completed Received/Posted February 29, 2012 - Daily Logs/Lab Reports Domestic Waterline Repair Project
9 Air Monitoring LCD Completed Received/Posted May 22, 2012 – Revised Monthly Air Monitoring Report for February 2012
9 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted Survey Storage Room 9D - Investigative Opening
9 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2012 - QPCR Air Sampling
9 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2011 - QPCR Air Sampling
9 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 18, 2012 - Limited Fungal Growth Exposure Assessment Surveys - Random Air Sampling
9 Fungal Growth Inspection and Exposure Assessment Survey HTI Completed Received/Posted September 30, 2011 - Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation
9 Fungal Growth Remediation Monitoring and Clearance Survey HTI Completed Received/Posted August 20, 2010 - Fungal Growth Remediation Monitoring and Clearance Surveys, 9th Floor
9 Indoor Air Quality Assessment HTI Completed Received/Posted April 2, 2010 – Limited Indoor Air Quality Survey, 9th Floor Pre-Occupancy Assessment
9 Post Cleaning Survey Report HTI Completed Received/Posted April 6, 2009 - 9th Floor Post Cleaning Survey Report
9 Flood – Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted April 3, 2009 - 9th Floor Limited Fungal Growth Exposure Assessment Survey
9 Indoor Air Quality Assessment HTI Completed Requested/Posted August 22, 2008 - Limited Indoor Air Quality Survey - 9th Floor
9 Restroom Assessment Report HTI Completed Received/Posted June 30, 2008 - Restroom Assessment Report
9 Cal/OHSA Notice of No Violation 5/23/08 Cal/OHSA Completed Received/Posted May 23, 2008 - Cal/OHSA Notice
9 January 4, 2008 Storm Water Intrusion McGinnis Chen Completed Received/Posted January 11, 2008 Report re Storm Water Intrusions
9 Air Sampling DGS Completed Received/Posted October 2, 2007 - MicroTest Report
9 Air sampling LaCroix Davis Completed Received/Posted January 18, 2006 - LaCroix Davis Report
8 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2014 - Random Sampling
8 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2014 - Random Sampling
8 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted May 2014 – Random Sampling
8 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted April 2014 – Random Sampling
8 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2014 – QPCR Air Sampling
8 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2014 – Random Sampling
8 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2014 – Random Sampling
8 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2014 – Random Sampling
8 Quarterly Air Monitoring Report Andersen Environmental Completed Received/Posted Fourth Quarter of 2013
8 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – Random Sampling
8 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – QPCR Air Sampling
8 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2013 – Random Sampling
8 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – Random Sampling
8 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 2013 – Random Sampling
8 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2013 – Random Sampling
8 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2013 – QPCR Air Sampling
8 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted August 2013 – Random Sampling
8 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2013 – Random Sampling
8 Quarterly Air Monitoring Report Andersen Environmental Completed Received/Posted Second Quarter of 2013
8 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2013 – Random Sampling
8 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted May 2013 – Random Sampling
8 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted April 2013 Random Sampling
8 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2013 Random Sampling
8 Statistical Analysis of Monthly Air Monitoring Data for Year 2012 LCD Completed Received/Posted Statistical Analysis of Monthly Air Monitoring Data for Year 2012
8 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2013 Random Sampling
8 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2013 Random Sampling
8 Mold Remediation LCD Completed Received/Posted January 15, 2013 Revised Closure Report Addenda
8 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2012 – QPCR Air Sampling
8 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2012 Random Sampling
8 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2012 Random Sampling
8 Monthly Air Monitoring Report LCD Completed Received/Posted Monthly Air Monitoring Report November 2012
8 Mold Remediation LCD Completed Received/Posted October 31 2012 – Closure Report Addendum
8 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 2012 – QPCR Air Sampling
8 Monthly air monitoring report LCD Completed Received/Posted October16, 2012 – Monthly Air Monitoring Report September 2012
8 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2012 Random Sampling
8 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 5, 2012 - Limited Fungal Growth Exposure Assessment Surveys September 2012 Random Sampling
8 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted September 14, 2012 - Limited Fungal Growth Exposure Assessment Survey August 2012 QPCR Air Sampling
8 VCT Removal Report LCD Completed Received/Posted August 30, 2012 Vinyl Composite Tile Removal Report
8 Monthly Air Monitoring Report LCD Completed Received/Posted August 15, 2012 – Monthly Air Monitoring Report July 2012
8 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2012 Random Sampling
8 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2012 – QPCR Air Sampling
8 Monthly Air Monitoring Report LCD Completed Received/Posted June 15, 2012 - Monthly Air Monitoring Report, May 2012
8 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted May 10, 2012 - April 2012 QPCR Air Sampling
8 Monthly air monitoring report LaCroix Davis Completed Received/Posted April 12, 2012 - Monthly Monitoring Report for March 2012
8 Water Line Repair Project LCD Completed Received/Posted February 29, 2012 - Daily Logs/Lab Reports Domestic Waterline Repair Project
8 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2012 - QPCR Air Sampling
8 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2011 - QPCR Air Sampling
8 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2011 - QPCR Air Sampling
8 Fungal Growth Inspection and Exposure Assessment Survey HTI Completed Received/Posted September 30, 2011 - Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation
8 Fungal Growth Remediation Monitoring and Clearance Survey HTI Completed Received/Posted October 15, 2010 - Fungal Growth Remediation Monitoring and Clearance Surveys, 8th Floor
8 Limited Indoor Air Quality Survey HTI Completed Received/Posted August 27, 2010 - Limited Indoor Air Quality Survey, 8th Floor Pre-Occupancy Assessment
8 Restroom Assessment Report HTI Completed Received/Posted June 30, 2008 - Restroom Assessment Report
8 Indoor Air Quality Assessment HTI Completed Requested/Posted June 27, 2008 - Indoor Air Quality Survey (revised)*
8 Cal/OHSA Notice of No Violation 5/23/08 Cal/OHSA Completed Received/Posted May 23, 2008 - Cal/OHSA Notice
8 January 4, 2008 Storm Water Intrusion McGinnis Chen Completed Received/Posted January 11, 2008 Report re Storm Water Intrusions
8 Fungi Evaluation Sterling Completed Received/Posted October 29, 2007- Sterling Report
8 Air sampling DGS Completed Received/Posted October 5, 2007 - MicroTest Report
7 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2014 - Random Sampling
7 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2014 - QPCR Air Sampling
7 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2014 - Random Sampling
7 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted May 2014 – Random Sampling
7 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted April 2014 – Random Sampling
7 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2014 – Random Sampling
7 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2014 – Random Sampling
7 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2014 – Random Sampling
7 Women's Restroom Water Leak HTI Completed Received/Posted February 6, 2014 – 7th Floor Women's Restroom Water Leak 450 N Street, Sacramento
7 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – Random Sampling
7 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – QPCR Air Sampling
7 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2013 – Random Sampling
7 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – Random Sampling
7 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 2013 – Random Sampling
7 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2013 – Random Sampling
7 Quarterly Air Monitoring Report Andersen Environmental Completed Received/Posted Third Quarter of 2013
7 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted August 2013 – Random Sampling
7 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2013 – Random Sampling
7 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2013 – Random Sampling
7 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted May 2013 – Random Sampling
7 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2013 – QPCR Air Sampling
7 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted April 2013 Random Sampling
7 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2013 Random Sampling
7 Statistical Analysis of Monthly Air Monitoring Data for Year 2012 LCD Completed Received/Posted Statistical Analysis of Monthly Air Monitoring Data for Year 2012
7 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2013 Random Sampling
7 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2013 Random Sampling
7 Mold Remediation LCD Completed Received/Posted January 15, 2013 Revised Closure Report Addenda
7 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2012 Random Sampling
7 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2012 Random Sampling
7 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2012 – QPCR Air Sampling
7 Monthly Air Monitoring Report LCD Completed Received/Posted November 19, 2012 – Monthly Air Monitoring Report October 2012
7 Mold Remediation LCD Completed Received/Posted October 31 2012 – Closure Report Addendum
7 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 2012 – QPCR Air Sampling
7 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted October 22, 2012 - Limited Fungal Growth Exposure Assessment Survey September 2012 QPCR Air Sampling
7 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2012 Random Sampling
7 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 5, 2012 - Limited Fungal Growth Exposure Assessment Surveys September 2012 Random Sampling
7 Monthly Air Monitoring Report LCD Completed Received/Posted September 19, 2012 – Monthly Air Monitoring Report August 2012
7 VCT Removal Report LCD Completed Received/Posted August 30, 2012 Vinyl Composite Tile Removal Report
7 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2012 QPCR Air Sampling
7 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2012 Random Sampling
7 Monthly Air Monitoring Report LCD Completed Received/Posted July 18, 2012 - Monthly Air Monitoring Report for June 2012
7 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted June 11, 2012 - May 2012 QPCR Air Sampling
7 Air Monitoring Report LCD Completed Received/Posted May 22, 2012 - Monthly Air Monitoring Report for April 2012
7 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted March, 2012 - QPCR Air Sampling
7 Water Line Repair Project LCD Completed Received/Posted February 29, 2012 - Daily Logs/Lab Reports Domestic Waterline Repair Project
7 Air Monitoring LCD Completed Received/Posted May 22, 2012 – Revised Monthly Air Monitoring Report for February 2012
7 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2012 - QPCR Air Sampling
7 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2011 - QPCR Air Sampling
7 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 18, 2012 - Limited Fungal Growth Exposure Assessment Surveys - Random Air Sampling
7 Air Monitoring for Volatile Organic Compounds (VOC's) Entek Completed Received/Posted November 30, 2011 - Entek Final Report of Air Monitoring for Volatile Organic Compounds (VOC's)
7 Fungal Growth Inspection and Exposure Assessment Survey HTI Completed Received/Posted September 30, 2011 - Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation
7 Limited Indoor Air Quality Survey HTI Completed Received/Posted July 30, 2010 - Limited Indoor Air Quality Survey,Pre-Occupancy Assessment
7 Employee Inquiry, Cubicle 140 HTI Completed Posted October 8, 2008 - Limited Fungal Growth Assessment Report
7 Restroom Assessment Report HTI Completed Received/Posted June 30, 2008 - Restroom Assessment Report
7 Report On The 7th Floor BioMax Environmental, LLC Completed Received/Posted BioMax Email Report Regarding Break Room 704
7 Indoor Air Quality Assessment HTI Completed Received/Posted July 18, 2008-7th Floor Indoor Air Quality Report (revised)*
7 Cal/OHSA Notice of No Violation 5/23/08 Cal/OHSA Completed Received/Posted May 23, 2008 - Cal/OHSA Notice
7 January 4, 2008 Storm Water Intrusion McGinnis Chen Completed Received/Posted January 11, 2008 Report re Storm Water Intrusions
7 Air sampling DGS Completed Received/Posted October 4, 2007 - MicroTest Report (3)
7 Air sampling DGS Completed Posted October 4, 2007 - MicroTest Report
7 Air Sampling DGS Completed Received/Posted October 2, 2007 - MicroTest Report
7 Air sampling LaCroix Davis Completed Received/Posted January 18, 2006 - LaCroix Davis Report
6 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2014 - Random Sampling
6 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2014 - Random Sampling
6 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted May 2014 – Random Sampling
6 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted April 2014 – Random Sampling
6 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2014 – QPCR Air Sampling
6 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2014 – Random Sampling
6 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2014 – Random Sampling
6 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2014 – Random Sampling
6 Women's Restroom Water Leak HTI Completed Received/Posted February 6, 2014 – 7th Floor Women's Restroom Water Leak 450 N Street, Sacramento
6 Quarterly Air Monitoring Report Andersen Environmental Completed Received/Posted Fourth Quarter of 2013
6 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – Random Sampling
6 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – QPCR Air Sampling
6 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2013 – Random Sampling
6 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – Random Sampling
6 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 2013 – Random Sampling
6 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2013 – Random Sampling
6 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2013 – QPCR Air Sampling
6 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted August 2013 – Random Sampling
6 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2013 – Random Sampling
6 Quarterly Air Monitoring Report Andersen Environmental Completed Received/Posted Second Quarter of 2013
6 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2013 – Random Sampling
6 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted May 2013 – Random Sampling
6 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted April 2013 Random Sampling
6 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2013 Random Sampling
6 Statistical Analysis of Monthly Air Monitoring Data for Year 2012 LCD Completed Received/Posted Statistical Analysis of Monthly Air Monitoring Data for Year 2012
6 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2013 Random Sampling
6 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2013 Random Sampling
6 Mold Remediation LCD Completed Received/Posted January 15, 2013 Revised Closure Report Addenda
6 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2012 – QPCR Air Sampling
6 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2012 Random Sampling
6 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2012 Random Sampling
6 Monthly Air Monitoring Report LCD Completed Received/Posted Monthly Air Monitoring Report November 2012
6 Mold Remediation LCD Completed Received/Posted October 31 2012 – Closure Report Addendum
6 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 2012 – QPCR Air Sampling
6 Monthly air monitoring report LCD Completed Received/Posted October16, 2012 – Monthly Air Monitoring Report September 2012
6 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2012 Random Sampling
6 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 5, 2012 - Limited Fungal Growth Exposure Assessment Surveys September 2012 Random Sampling
6 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted September 14, 2012 - Limited Fungal Growth Exposure Assessment Survey August 2012 QPCR Air Sampling
6 VCT Removal Report LCD Completed Received/Posted August 30, 2012 Vinyl Composite Tile Removal Report
6 Monthly Air Monitoring Report LCD Completed Received/Posted August 15, 2012 – Monthly Air Monitoring Report July 2012
6 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2012 Random Sampling
6 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2012 – QPCR Air Sampling
6 Monthly Air Monitoring Report LCD Completed Received/Posted June 15, 2012 - Monthly Air Monitoring Report, May 2012
6 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted May 10, 2012 - April 2012 QPCR Air Sampling
6 Monthly air monitoring report LaCroix Davis Completed Received/Posted April 12, 2012 - Monthly Monitoring Report for March 2012
6 Water Line Repair Project LCD Completed Received/Posted February 29, 2012 - Daily Logs/Lab Reports Domestic Waterline Repair Project
6 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2012 - QPCR Air Sampling
6 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2011 - QPCR Air Sampling
6 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2011 - QPCR Air Sampling
6 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 18, 2012 - Limited Fungal Growth Exposure Assessment Surveys - Random Air Sampling
6 Limited Drinking Water Quality Assessment HTI Completed Received/Posted January 6, 2012 - Limited Drinking Water Quality Assessment
6 Fungal Growth Inspection and Exposure Assessment Survey HTI Completed Received/Posted September 30, 2011 - Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation
6 Fungal Growth Remediation Monitoring and Clearance Survey HTI Completed Received/Posted November 15, 2010 - Fungal Growth Remediation Monitoring and Clearance Survey, 6th Floor
6 Limited Indoor Air Quality Survey HTI Completed Received/Posted June 29, 2010 - 6th Floor Pre-Occupancy Assessment
6 Storage Area Assessment Report Biomax Completed Received/Posted November 18, 2008 - Assessment and Mitigation Procedures Report
6 Indoor Air Quality Assessment HTI Completed Received/Posted July 18, 2008 - Limited Indoor Air Quality Survey
6 Restroom Assessment Report HTI Completed Received/Posted June 30, 2008 - Restroom Assessment Report
6 Indoor Air Quality Assessment HTI Completed Requested/Pending  
6 Cal/OHSA Notice of No Violation 5/23/08 Cal/OHSA Completed Received/Posted May 23, 2008 - Cal/OHSA Notice
6 Air Sampling DGS Completed Received/Posted October 2, 2007 - MicroTest Report
5 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2014 - Random Sampling
5 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2014 - QPCR Air Sampling
5 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2014 - Random Sampling
5 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted May 2014 – Random Sampling
5 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted April 2014 – Random Sampling
5 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2014 – Random Sampling
5 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2014 – Random Sampling
5 Follow-up Inspection HTI Completed Received/Posted 5th Floor Women's Restroom
5 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2014 – Random Sampling
5 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – Random Sampling
5 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – QPCR Air Sampling
5 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – Random Sampling
5 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 2013 – Random Sampling
5 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2013 – Random Sampling
5 Quarterly Air Monitoring Report Andersen Environmental Completed Received/Posted Third Quarter of 2013
5 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted August 2013 – Random Sampling
5 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2013 – Random Sampling
5 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2013 – Random Sampling
5 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted May 2013 – Random Sampling
5 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2013 – QPCR Air Sampling
5 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted April 2013 Random Sampling
5 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2013 Random Sampling
5 Statistical Analysis of Monthly Air Monitoring Data for Year 2012 LCD Completed Received/Posted Statistical Analysis of Monthly Air Monitoring Data for Year 2012
5 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2013 Random Sampling
5 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2013 Random Sampling
5 Mold Remediation LCD Completed Received/Posted January 15, 2013 Revised Closure Report Addenda
5 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2012 Random Sampling
5 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2012 Random Sampling
5 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2012 – QPCR Air Sampling
5 Monthly Air Monitoring Report LCD Completed Received/Posted November 19, 2012 – Monthly Air Monitoring Report October 2012
5 Mold Remediation LCD Completed Received/Posted October 31 2012 – Closure Report Addendum
5 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 2012 – QPCR Air Sampling
5 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted October 22, 2012 - Limited Fungal Growth Exposure Assessment Survey September 2012 QPCR Air Sampling
5 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2012 Random Sampling
5 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 5, 2012 - Limited Fungal Growth Exposure Assessment Surveys September 2012 Random Sampling
5 Monthly Air Monitoring Report LCD Completed Received/Posted September 19, 2012 – Monthly Air Monitoring Report August 2012
5 VCT Removal Report LCD Completed Received/Posted August 30, 2012 Vinyl Composite Tile Removal Report
5 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2012 QPCR Air Sampling
5 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2012 Random Sampling
5 Monthly Air Monitoring Report LCD Completed Received/Posted July 18, 2012 - Monthly Air Monitoring Report for June 2012
5 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted June 11, 2012 - May 2012 QPCR Air Sampling
5 Air Monitoring Report LCD Completed Received/Posted May 22, 2012 - Monthly Air Monitoring Report for April 2012
5 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted March, 2012 - QPCR Air Sampling
5 Water Line Repair Project LCD Completed Received/Posted February 29, 2012 - Daily Logs/Lab Reports Domestic Waterline Repair Project
5 Air Monitoring LCD Completed Received/Posted May 22, 2012 – Revised Monthly Air Monitoring Report for February 2012
5 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2012 - QPCR Air Sampling
5 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2011 - QPCR Air Sampling
5 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 18, 2012 - Limited Fungal Growth Exposure Assessment Surveys - Random Air Sampling
5 Fungal Growth Inspection and Exposure Assessment Survey HTI Completed Received/Posted September 30, 2011 - Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation
5 Odor investigation HTI Completed Received/Posted December 8, 2008 - 5th Floor Odor investigation
5 Storage Area Assessment Report Biomax Completed Received/Posted November 18, 2008 - Assessment and Mitigation Procedures Report
5 Restroom Assessment Report HTI Completed Received/Posted June 30, 2008 - Restroom Assessment Report
5 Indoor Air Quality Assessment HTI Completed Received/Posted June 20, 2008 - Indoor Air Quality Assessment, 5th Floor (revised)*
5 Cal/OHSA Notice of No Violation 5/23/08 Cal/OHSA Completed Received/Posted May 23, 2008 - Cal/OHSA Notice
5 Air Sampling DGS Completed Received/Posted October 2, 2007 - MicroTest Report
4 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2014 - Random Sampling
4 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2014 - Random Sampling
4 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted May 2014 – Random Sampling
4 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted April 2014 – Random Sampling
4 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2014 – QPCR Air Sampling
4 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2014 – Random Sampling
4 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2014 – Random Sampling
4 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2014 – Random Sampling
4 Quarterly Air Monitoring Report Andersen Environmental Completed Received/Posted Fourth Quarter of 2013
4 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – Random Sampling
4 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – QPCR Air Sampling
4 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2013 – Random Sampling
4 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – Random Sampling
4 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 2013 – Random Sampling
4 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2013 – Random Sampling
4 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2013 – QPCR Air Sampling
4 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted August 2013 – Random Sampling
4 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2013 – Random Sampling
4 Quarterly Air Monitoring Report Andersen Environmental Completed Received/Posted Second Quarter of 2013
4 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2013 – Random Sampling
4 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted May 2013 – Random Sampling
4 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted April 2013 Random Sampling
4 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2013 Random Sampling
4 Statistical Analysis of Monthly Air Monitoring Data for Year 2012 LCD Completed Received/Posted Statistical Analysis of Monthly Air Monitoring Data for Year 2012
4 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2013 Random Sampling
4 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2013 Random Sampling
4 Mold Remediation LCD Completed Received/Posted January 15, 2013 Revised Closure Report Addenda
4 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2012 – QPCR Air Sampling
4 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2012 Random Sampling
4 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2012 Random Sampling
4 Monthly Air Monitoring Report LCD Completed Received/Posted Monthly Air Monitoring Report November 2012
4 Mold Remediation LCD Completed Received/Posted October 31 2012 – Closure Report Addendum
4 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 2012 – QPCR Air Sampling
4 Monthly air monitoring report LCD Completed Received/Posted October16, 2012 – Monthly Air Monitoring Report September 2012
4 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2012 Random Sampling
4 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 5, 2012 - Limited Fungal Growth Exposure Assessment Surveys September 2012 Random Sampling
4 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted September 14, 2012 - Limited Fungal Growth Exposure Assessment Survey August 2012 QPCR Air Sampling
4 VCT Removal Report LCD Completed Received/Posted August 30, 2012 Vinyl Composite Tile Removal Report
4 Monthly Air Monitoring Report LCD Completed Received/Posted August 15, 2012 – Monthly Air Monitoring Report July 2012
4 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2012 Random Sampling
4 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2012 – QPCR Air Sampling
4 Monthly Air Monitoring Report LCD Completed Received/Posted June 15, 2012 - Monthly Air Monitoring Report, May 2012
4 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted May 10, 2012 - April 2012 QPCR Air Sampling
4 Monthly air monitoring report LaCroix Davis Completed Received/Posted April 12, 2012 - Monthly Monitoring Report for March 2012
4 Water Line Repair Project LCD Completed Received/Posted February 29, 2012 - Daily Logs/Lab Reports Domestic Waterline Repair Project
4 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2012 - QPCR Air Sampling
4 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2011 - QPCR Air Sampling
4 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2011 - QPCR Air Sampling
4 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 18, 2012 - Limited Fungal Growth Exposure Assessment Surveys - Random Air Sampling
4 Fungal Growth Inspection and Exposure Assessment Survey HTI Completed Received/Posted September 30, 2011 - Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation
4 Fungal Growth Remediation Monitoring and Clearance Survey, 4th Floor HTI Completed Received/Posted December 22, 2010 - Fungal Growth Remediation Monitoring and Clearance Survey, 4th Floor
4 4TH Floor Pre-Occupancy Assessment HTI Completed Received/Posted August 27, 2009 - Limited Indoor Air Quality Survey - 4TH Floor Pre-Occupancy Assessment
4 Indoor Air Quality Assessment HTI Completed Received/Posted August 1, 2008 - Indoor Air Quality Survey
4 Restroom Assessment Report HTI Completed Received/Posted June 30, 2008 - Restroom Assessment Report
4 Indoor Air Quality Assessment HTI Completed Requested/Pending  
4 Cal/OHSA Notice of No Violation 5/23/08 Cal/OHSA Completed Received/Posted May 23, 2008 - Cal/OHSA Notice
4 Air Sampling DGS Completed Received/Posted October 2, 2007 - MicroTest Report
3 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2014 - Random Sampling
3 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2014 - QPCR Air Sampling
3 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2014 - Random Sampling
3 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted May 2014 – Random Sampling
3 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted April 2014 – Random Sampling
3 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2014 – Random Sampling
3 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2014 – Random Sampling
3 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2014 – Random Sampling
3 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – Random Sampling
3 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – QPCR Air Sampling
3 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2013 – Random Sampling
3 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – Random Sampling
3 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 2013 – Random Sampling
3 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2013 – Random Sampling
3 Quarterly Air Monitoring Report Andersen Environmental Completed Received/Posted Third Quarter of 2013
3 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted August 2013 – Random Sampling
3 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2013 – Random Sampling
3 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2013 – Random Sampling
3 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted May 2013 – Random Sampling
3 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2013 – QPCR Air Sampling
3 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted April 2013 Random Sampling
3 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2013 Random Sampling
3 Statistical Analysis of Monthly Air Monitoring Data for Year 2012 LCD Completed Received/Posted Statistical Analysis of Monthly Air Monitoring Data for Year 2012
3 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2013 Random Sampling
3 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2013 Random Sampling
3 Mold Remediation LCD Completed Received/Posted January 15, 2013 Revised Closure Report Addenda
3 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2012 Random Sampling
3 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2012 Random Sampling
3 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2012 – QPCR Air Sampling
3 Monthly Air Monitoring Report LCD Completed Received/Posted November 19, 2012 – Monthly Air Monitoring Report October 2012
3 Mold Remediation LCD Completed Received/Posted October 31 2012 – Closure Report Addendum
3 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 2012 – QPCR Air Sampling
3 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted October 22, 2012 - Limited Fungal Growth Exposure Assessment Survey September 2012 QPCR Air Sampling
3 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2012 Random Sampling
3 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 5, 2012 - Limited Fungal Growth Exposure Assessment Surveys September 2012 Random Sampling
3 Monthly Air Monitoring Report LCD Completed Received/Posted September 19, 2012 – Monthly Air Monitoring Report August 2012
3 VCT Removal Report LCD Completed Received/Posted August 30, 2012 Vinyl Composite Tile Removal Report
3 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2012 QPCR Air Sampling
3 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2012 Random Sampling
3 Monthly Air Monitoring Report LCD Completed Received/Posted July 18, 2012 - Monthly Air Monitoring Report for June 2012
3 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted June 11, 2012 - May 2012 QPCR Air Sampling
3 Air Monitoring Report LCD Completed Received/Posted May 22, 2012 - Monthly Air Monitoring Report for April 2012
3 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted March, 2012 - QPCR Air Sampling
3 Water Line Repair Project LCD Completed Received/Posted February 29, 2012 - Daily Logs/Lab Reports Domestic Waterline Repair Project
3 Air Monitoring LCD Completed Received/Posted May 22, 2012 – Revised Monthly Air Monitoring Report for February 2012
3 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2012 - QPCR Air Sampling
3 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2011 - QPCR Air Sampling
3 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 18, 2012 - Limited Fungal Growth Exposure Assessment Surveys - Random Air Sampling
3 Fungal Growth Inspection and Exposure Assessment Survey HTI Completed Received/Posted September 30, 2011 - Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation
3 Indoor Air Quality Report HTI Completed Received/Posted May 5, 2010 - Indoor Air Quality Report, 3rd Floor Cubicle 38 Area
3 Pre-Occupancy Assessment HTI Completed Received/Posted May 3, 2010 - Limited Indoor Air Quality Survey, 3rd Floor Pre-Occupancy Assessment
3 Restroom Assessment Report HTI Completed Received/Posted June 30, 2008 - Restroom Assessment Report
3 Indoor Air Quality Survey HTI Completed Received/Posted June 25, 2008 - Air Quality Report (revised)*
3 Indoor Air Quality Assessment HTI Completed Requested/Pending  
3 Cal/OHSA Notice of No Violation 5/23/08 Cal/OHSA Completed Received/Posted May 23, 2008 - Cal/OHSA Notice
3 Fungi Evaluation Sterling Completed Received/Posted October 29, 2007- Sterling Report
3 Air Sampling Entek Completed Received/Posted October 26, 2007 - Entek Report
3 Air sampling DGS Completed Received/Posted October 5, 2007 - MicroTest Report
3 Air sampling DGS Completed Received/Posted October 4, 2007 - MicroTest Report (3)
3 Air sampling DGS Completed Received/Posted October 4, 2007 - MicroTest Report
3 Air sampling DGS Completed Received/Posted October 3, 2007 - MicroTest Report
3 Air sampling DGS Completed Received/Posted October 3, 2007 - MicroTest Report (2)
3 Air Sampling DGS Completed Received/Posted October 2, 2007 - MicroTest Report
3 Air sampling DGS Completed Received/Posted January 22, 2007 - MicroTest Report
3 Air sampling DGS Completed Received/Posted January 10, 2007 - MicroTest Report
3 Air sampling DGS Completed Received/Posted February 27, 2006 - MicroTest Report
3 Air sampling LaCroix Davis Completed Received/Posted January 18, 2006 - LaCroix Davis Report
3 Air sampling DGS Completed Received/Posted November 4, 2004 - DGS Report
3 Air sampling DGS Completed Received/Posted July 20, 2004 - DGS Report
2 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2014 - Random Sampling
2 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2014 - Random Sampling
2 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted May 2014 – Random Sampling
2 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted April 2014 – Random Sampling
2 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2014 – QPCR Air Sampling
2 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2014 – Random Sampling
2 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2014 – Random Sampling
2 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2014 – Random Sampling
2 Quarterly Air Monitoring Report Andersen Environmental Completed Received/Posted Fourth Quarter of 2013
2 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – Random Sampling
2 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – QPCR Air Sampling
2 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – Random Sampling
2 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 2013 – Random Sampling
2 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2013 – Random Sampling
2 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2013 – QPCR Air Sampling
2 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted August 2013 – Random Sampling
2 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2013 – Random Sampling
2 Quarterly Air Monitoring Report Andersen Environmental Completed Received/Posted Second Quarter of 2013
2 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2013 – Random Sampling
2 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted May 2013 – Random Sampling
2 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted April 2013 Random Sampling
2 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2013 Random Sampling
2 Statistical Analysis of Monthly Air Monitoring Data for Year 2012 LCD Completed Received/Posted Statistical Analysis of Monthly Air Monitoring Data for Year 2012
2 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2013 Random Sampling
2 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2013 Random Sampling
2 Mold Remediation LCD Completed Received/Posted January 15, 2013 Revised Closure Report Addenda
2 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2012 – QPCR Air Sampling
2 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2012 Random Sampling
2 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2012 Random Sampling
2 Monthly Air Monitoring Report LCD Completed Received/Posted Monthly Air Monitoring Report November 2012
2 Mold Remediation LCD Completed Received/Posted October 31 2012 – Closure Report Addendum
2 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 2012 – QPCR Air Sampling
2 Monthly air monitoring report LCD Completed Received/Posted October16, 2012 – Monthly Air Monitoring Report September 2012
2 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2012 Random Sampling
2 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 5, 2012 - Limited Fungal Growth Exposure Assessment Surveys September 2012 Random Sampling
2 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted September 14, 2012 - Limited Fungal Growth Exposure Assessment Survey August 2012 QPCR Air Sampling
2 VCT Removal Report LCD Completed Received/Posted August 30, 2012 Vinyl Composite Tile Removal Report
2 Monthly Air Monitoring Report LCD Completed Received/Posted August 15, 2012 – Monthly Air Monitoring Report July 2012
2 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2012 Random Sampling
2 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2012 – QPCR Air Sampling
2 Monthly Air Monitoring Report LCD Completed Received/Posted June 15, 2012 - Monthly Air Monitoring Report, May 2012
2 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted May 10, 2012 - April 2012 QPCR Air Sampling
2 Monthly air monitoring report LaCroix Davis Completed Received/Posted April 12, 2012 - Monthly Monitoring Report for March 2012
2 Water Line Repair Project LCD Completed Received/Posted February 29, 2012 - Daily Logs/Lab Reports Domestic Waterline Repair Project
2 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2012 - QPCR Air Sampling
2 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2011 - QPCR Air Sampling
2 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 18, 2012 - Limited Fungal Growth Exposure Assessment Surveys - Random Air Sampling
2 Fungal Growth Inspection and Exposure Assessment Survey HTI Completed Received/Posted September 30, 2011 - Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation
2 Fungal Growth Remediation Monitoring and Clearance Survey, 2nd Floor HTI Completed Received/Posted December 21, 2010 - Fungal Growth Remediation Monitoring and Clearance Survey, 2nd Floor
2 Limited Indoor Air Quality Survey HTI Completed Received/Posted November 11, 2010 - Limited Indoor Air Quality Survey, 2nd Floor Pre-Occupancy Assessment
2 Restroom Assessment Report HTI Completed Received/Posted June 30, 2008 - Restroom Assessment Report
2 Indoor Air Quality Assessment HTI Completed Received/Posted August 8, 2008 - Limited Indoor Air Quality Survey
2 Cal/OHSA Notice of No Violation 5/23/08 Cal/OHSA Completed Received/Posted May 23, 2008 - Cal/OHSA Notice
2 Fungi Evaluation Sterling Completed Received/Posted October 29, 2007- Sterling Report
2 Air Sampling DGS Completed Received/Posted October 2, 2007 - MicroTest Report
2 Air sampling DGS Completed Received/Posted January 22, 2007 - MicroTest Report
2 Air sampling LaCroix Davis Completed Received/Posted January 18, 2006 - LaCroix Davis Report
2 Air sampling DGS Completed Received/Posted November 4, 2004 - DGS Report
2 Air sampling DGS Completed Received/Posted July 20, 2004 - DGS Report
1 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2014 - Random Sampling
1 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2014 - QPCR Air Sampling
1 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2014 - Random Sampling
1 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted May 2014 – Random Sampling
1 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted April 2014 – Random Sampling
1 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2014 – Random Sampling
1 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2014 – Random Sampling
1 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2014 – Random Sampling
1 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – Random Sampling
1 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – QPCR Air Sampling
1 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – Random Sampling
1 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 2013 – Random Sampling
1 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2013 – Random Sampling
1 Quarterly Air Monitoring Report Andersen Environmental Completed Received/Posted Third Quarter of 2013
1 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted August 2013 – Random Sampling
1 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2013 – Random Sampling
1 Quarterly Air Monitoring Report Andersen Environmental Completed Received/Posted Second Quarter of 2013
1 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2013 – Random Sampling
1 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted May 2013 – Random Sampling
1 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted June 2013 – QPCR Air Sampling
1 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted April 2013 Random Sampling
1 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted March 2013 Random Sampling
1 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted February 2013 Random Sampling
1 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2013 Random Sampling
1 Mold Remediation LCD Completed Received/Posted January 15, 2013 Revised Closure Report Addenda
1 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2012 Random Sampling
1 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2012 Random Sampling
1 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2012 – QPCR Air Sampling
1 Monthly Air Monitoring Report LCD Completed Received/Posted November 19, 2012 – Monthly Air Monitoring Report October 2012
1 Mold Remediation LCD Completed Received/Posted October 31 2012 – Closure Report Addendum
1 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted October 22, 2012 - Limited Fungal Growth Exposure Assessment Survey September 2012 QPCR Air Sampling
1 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted September 2012 Random Sampling
1 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted October 5, 2012 - Limited Fungal Growth Exposure Assessment Surveys September 2012 Random Sampling
1 Monthly Air Monitoring Report LCD Completed Received/Posted September 19, 2012 – Monthly Air Monitoring Report August 2012
1 Occupational Noise Exposure Monitoring and Sound Level Survey HTI Completed Received/Posted September 2012 Mail Room 143 Noise Exposure Survey
1 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2012 QPCR Air Sampling
1 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted July 2012 Random Sampling
1 Monthly Air Monitoring Report LCD Completed Received/Posted July 18, 2012 - Monthly Air Monitoring Report for June 2012
1 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted June 11, 2012 - May 2012 QPCR Air Sampling
1 Air Monitoring Report LCD Completed Received/Posted May 22, 2012 - Monthly Air Monitoring Report for April 2012
1 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted March, 2012 - QPCR Air Sampling
1 Water Line Repair Project LCD Completed Received/Posted February 29, 2012 - Daily Logs/Lab Reports Domestic Waterline Repair Project
1 Air Monitoring LCD Completed Received/Posted May 22, 2012 – Revised Monthly Air Monitoring Report for February 2012
1 Asbestos and Lead Based Paint Survey LaCroix Davis Completed Received/Posted February 29, 2012 - Asbestos and Lead Based Paint Survey
1 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 2012 - QPCR Air Sampling
1 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted November 2011 - QPCR Air Sampling
1 Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted January 18, 2012 - Limited Fungal Growth Exposure Assessment Surveys - Random Air Sampling
1 Airborne Fibrous Glass Exposure Assessment Survey HTI Completed Received/Posted October 27, 2011 - Airborne Fibrous Glass Exposure Assessment Survey, Print Room 139
1 Fungal Growth Inspection and Exposure Assessment Survey HTI Completed Received/Posted September 30, 2011 - Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation
1 Exposure Potential Monitoring for Volatile Organic Compounds HTI Completed Received/Posted June 15, 2010 - Exposure Potential Monitoring for Volatile Organic Compounds, 1st Floor and Garage Areas
1 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted December 18, 2009 - Limited Fungal Growth Exposure Assessment Survey, First Floor Day Care
1 Indoor Air Quality Survey HTI Completed Received/Posted September 4, 2008 - Limited Indoor Air Quality Survey - 1st Floor
1 Room 135 Assessment Report HTI Completed Received/Posted August 1, 2008 - Print Room 135 Report
1 Restroom Assessment Report HTI Completed Received/Posted June 30, 2008 - Restroom Assessment Report
1 Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted June 16, 2008 first Floor Security Guard Kiosk
1 Indoor Air Quality Assessment HTI In progress Requested/Pending  
1 Sprinkler Leak HTI  
1 Cal/OHSA Notice of No Violation 5/23/08 Cal/OHSA Completed Received/Posted May 23, 2008 - Cal/OHSA Notice
1 Day Care HTI Completed Requested/Posted May 1, 2008 - HTI Report
1 1st Floor Assessment Report HTI Completed Received/Posted April 16, 2008 - HTI Report
1 Airborne Total Fungi Results HTI Completed Received/Posted April 9, 2008 – Airborne Total Fungi Results, 1st Floor (Tables Only)
1 Day Care HTI Completed Received/Posted January 7, 2008 HTI Report
1 Mail Room HTI Completed Received/Posted December 10, 2007 HTI Report
1 Mail Room HTI Completed Received/Posted November 15, 2007 – HTI Report
1 Day Care HTI Completed Received/Posted November 28, 2007 HTI Report
1 Fungi Evaluation Sterling Completed Received/Posted October 29, 2007- Sterling Report
1 Air Sampling DGS Completed Received/Posted October 2, 2007 - Microtest
1 Air sampling DGS Completed Posted January 22, 2007 - MicroTest Report
Odor Reports Indoor Air Quality/Odor Assessment LaCroix Davis Completed Received/Posted June 18, 2012 - Indoor Air Quality/Odor Assessment
Odor Reports Indoor Air Quality/Odor Assessment LaCroix Davis Completed Received/Posted June 18, 2012 - Appendix A EMLab Laboratory Reports
Odor Reports Indoor Air Quality/Odor Assessment LaCroix Davis Completed Received/Posted June 18, 2012 - Appendix B EAS Laboratory Reports
Odor Reports Posting of Proposition 65 Warnings HTI Completed Received/Posted August 19, 2011 - Posting of Proposition 65 Warnings
Odor Reports Odor Investigation Report LaCroix Davis Completed Received/Posted May 24, 2011 - 19th,21st and 22nd Floor Tile and Odor Investigation Report
Ducts Fungal Growth Inspection and Exposure Assessment Survey HTI Completed Received/Posted September 30, 2011 - Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation
Ducts Response to July 22 DGS Memo HTI Completed Received/Posted August 3, 2011 - Response to California Department of General Services Letter Dated July 22, 2011
Ducts Mezzanine-Mechanical Duct Testing Results DGS Completed Received/Posted July 22, 2011 – Mechanical Duct Testing Results, M Floor Supply Fans 3 and 4
Ducts Fungal Growth Inspection and Exposure Assessment Survey HTI Completed Received/Posted July 15, 2011 - Fungal Growth Inspection and Exposure Assessment Surveys M Floor Supply Fans 3 & 4
Ducts Fungal Growth Remediation Monitoring and Exposure Assessment Survey HTI Completed Received/Posted May 25, 2011 - Fungal Growth Remediation Monitoring and Exposure Assessment Survey, M Floor Supply Fans 1 & 2 Room
Ducts Fungal Growth Remediation Monitoring and Exposure Assessment Survey HTI Completed Received/Posted April 21, 2011 - Fungal Growth Remediation Monitoring and Exposure Assessment Surveys, M Floor Supply Fans 3 & 4 Room
Elevators Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted July 24, 2009 - Limited Fungal Growth Exposure Assessment Survey - Elevator Shaft Encapsulation Monitoring
Elevators Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted/Revised to show correct date in third paragraph July 15, 2009 - Limited Fungal Growth Exposure Assessment Survey - Elevator Shaft Abatement and Encapsulation Monitoring
Elevators Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted June 25, 2009 - Limited Fungal Growth Exposure Assessment Survey - Elevator Shaft Abatement Monitoring
Elevators Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted June 24, 2009 - Limited Fungal Growth Exposure Assessment Survey - Elevator Lobby Areas
Elevators Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted June 23, 2009 - Limited Fungal Growth Exposure Assessment Survey - Elevator Lobby Areas
Elevators Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted June 19, 2009 - Limited Fungal Growth Exposure Assessment Survey - Elevator Lobby Areas
Elevators Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted June 10, 2009 - Limited Fungal Growth Exposure Assessment Survey Conducted 3-9-09 - Elevator Lobby Areas
Elevators Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted June 10, 2009 - Limited Fungal Growth Exposure Assessment Survey Conducted 2-18-09 - Elevator LobbyAreas
Elevators Review of Letter Summary Report Hygiene Tech Completed Received/Posted April 15, 2009 – Review of Letter Summary Report – Elevator Shaft Mitigation Procedures
Elevators Mitigation Procedures BioMax Completed Received/Posted March 19, 2009 -- Letter Summary Report , Elevator Shaft Mitigation Procedures
Elevators Air Sampling Report Hygiene Tech Completed Received/Posted Feb 26 2009 -- Limited Fungal Growth Exposure Assessment Survey, Elevator Lobby Areas
Elevators Air Sampling Report Hygiene Tech Completed Received/Posted December 17, 2008-Limited Fungal Growth Exposure Assessment Survey Elevator Lobby Areas
Elevators Air Sampling Report Hygiene Tech Completed Received/Posted December 15, 2008-Limited Fungal Growth Exposure Assessment Follow-Up Survey Elevator Lobby Areas
Elevators Air Sampling Report Hygiene Tech Completed Received/Posted September 24, 2008 - Limited Fungal Growth Exposure Assessment Survey - Elevator Lobby Areas
Elevators Preliminary External Elevator Shaft Observations LaCroix Davis Completed Received/Posted September 4, 2008 – Preliminary External Elevator Shaft Observations, 22nd Floor
Elevators Preliminary Interior Elevator Shaft Report LaCroix Davis Completed Received/Posted September 2, 2008 – Preliminary Interior Elevator Shaft Report
 
Elevator Shaft 1 HTI Completed Received/Posted August 12, 2008 - Elevator Shaft 1 Photos
Elevator Shaft 2 HTI Completed Received/Posted August 12, 2008 - Elevator Shaft 2 Photos
Elevator Shaft 3 HTI Completed Received/Posted August 12, 2008 - Elevator Shaft 3 Photos
Elevator Shaft 4 HTI Completed Received/Posted August 12, 2008 - Elevator Shaft 4 Photos
Elevator Shaft 5 HTI Completed Received/Posted August 17, 2008 - Elevator Shaft 5 Photos
Elevator Shaft 6 HTI Completed Received/Posted August 17, 2008 - Elevator Shaft 6 Photos
Elevator Shaft 7 HTI Completed Received/Posted August 20, 2008 - Elevator Shaft 7 Photos
Elevator Shaft 8 HTI Completed Received/Posted August 18, 2008 - Elevator Shaft 8 Photos
Elevator Shaft 9 HTI Completed Received/Posted August 18, 2008 - Elevator Shaft 9 Photos
Elevator Shaft 10 HTI Completed Received/Posted August 11, 2008 - Elevator Shaft 10 Photos
Freight Elevator Shaft HTI Completed Received/Posted August 11, 2008 - Freight Elevator Shaft Photos
Elevators Response to August 6 David Gau Letter DGS Completed Received/Posted August 11, 2008 – DGS Letter Response to Gau Inquiry
Elevators Highlight Investigative Work David Gau Completed Received/Posted August 8, 2008 – Additional Water Intrusion Investigative Work
Elevators Request for Work Plan David Gau Completed Received/Posted August 8, 2008 – Letter to HTI from David Gau – Elevator Shaft and 21st Floor Odors
Elevators Request for Clarification David Gau Completed Received/Posted August 6, 2008 – Follow up Letter to DGS from David Gau
Elevators Preliminary Elevator Survey LaCroix Davis Completed Received/Posted August 4, 2008 – Preliminary Elevator Survey and Planned Scope of Work
Elevators Discovery of Evidence of Water Intrusion HTI Completed Received/Posted August 1, 2008 – Discovery of Evidence of Water Intrusion – Elevator shafts
Elevators Request for preliminary report David Gau Completed Received/Posted August 1, 2008 – Letter to DGS from David Gau – Elevator Shafts
Elevators Air Quality Report HTI Completed Received/Posted July 28, 2008 – Limited Fungal Growth Exposure Assessment Survey Report
Elevators Visual Inspection Memo HTI Completed Received/Posted July 25, 2008 – Elevator Shafts Visual Inspection Memo
Elevators Elevator Survey LaCroix Davis Completed Received/Posted July 24, 2008 – Preliminary Elevator Survey
Annex Locations 621 Capitol Mall – 24th Floor Areas HTI Completed Received/Posted 621 capitol Mall – 24th Floor Areas
Annex Locations 621 Capitol Mall – Water Leak HTI Completed Received/Posted 23rd Floor – Break Room 2324 Water Leak 1/16/2014
Annex Locations 621 Capitol Mall - Limited Fungal Growth Exposure Assessment Surveys HTI Completed Received/Posted December 2013 – Random Sampling
Annex Locations 621 Capitol Mall - 24th Floor Surface Fungal Growth Assessment HTI Completed Received/Posted October 1, 2010 - Surface Fungal Growth Assessment Involving HQ 24th Floor Paintings at 621 Capitol Mall
FTB Sampling Boxes from BOE Entek Completed Received/Posted February 20, 2008 Evaluation of Dust on Boxes Moved from BOE to Franc hise Tax Board
San Diego Limited Surface Particulate Composition Survey HTI Completed Received/Posted January 28, 2010 - Limited Surface Particulate Composition Survey1350 Front Street, San Diego, California
Van Nuys Limited Fungal Growth Exposure Assessment Survey HTI Completed Received/Posted Limited Fungal Growth Exposure Assessment Survey 15350 Sherman Way, Van Nuys, California - 2nd Floor

*Per Hygiene Technologies, the revision to this document is a one word change made in the first sentence of the second paragraph in Section 4.5 replacing the word "respirable" with "total" in reference to dust. Respirable dust refers to the portion of airborne dust that's small enough to penetrate the nose and upper respiratory into the lungs. Total dust includes all airborne particles, regardless of size or composition. The sampling method Hygiene Technologies employed in the BOE building collects total dust only.